My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - CMc for Madison Lifestyle New Parking Garage Proj No 123-074 - Shiel Sexton
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - CMc for Madison Lifestyle New Parking Garage Proj No 123-074 - Shiel Sexton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 1:08:48 PM
Creation date
12/17/2024 1:08:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Madison Lifestyle District - CMc RFP Response • Shiel Sexton | 19Confidential material included on this page. <br />NON-COLLUSION FORM <br />SIX-POINT XBE MAXIMIZATION PROGRAM <br />DIVERSITY & LOCAL PARTICIPATION <br />Shiel Sexton’s commitment to genuine diversity, equity and inclusion <br />strives to generate a lasting impact on the local and diverse <br />supplier community. Our progressive approach focuses its <br />efforts on a strategy that builds from the inside out. <br />Committing to a Multi-Layered Approach to <br />OUTREACH <br />Shiel Sexton will conduct a series of <br />informational workshops outlining <br />upcoming project opportunities. <br />The workshops allow Shiel Sexton to <br />assess current XBE firm capabilities <br />and for XBE firms to prepare in <br />terms of manpower and cash flow. <br />PROCUREMENT <br />The CM team carefully reviews <br />the submitted bids and evaluates <br />them for scope responsiveness <br />and XBE participation level, which <br />bidders must report with the bid. <br />This information is established with <br />the original participation goal as the <br />project’s reporting baseline. <br />IMPLEMENTATION <br />The CM team keeps open and <br />active lines of communication <br />with XBE contractors throughout <br />construction. When apprised <br />of transparent operational and <br />financial progress, Shiel Sexton <br />can identify potential issues <br />before they arise and take action <br />to ensure the project’s success. <br />REPORTING <br />The CM team tracks and reports <br />the program’s results on a regular <br />basis. This continuous monitoring <br />ensures that the project meets <br />(or exceeds) all XBE participation <br />objectives. <br />ANALYSIS <br />Project teams analyze the gathered <br />information to develop a unified <br />procurement plan and curate bid <br />packages designed to match the <br />core strengths of the XBE firms. <br />ALIGNMENT <br />A second outreach phase takes <br />place following bid package break <br />out. Our estimators notify interested <br />XBE firms with bid package details. <br />The Shiel Sexton team will work with <br />XBE firms interested in pursuing <br />specific bid packages with a <br />subcontractor partner. <br />01 <br />04 05 06 <br />02 <br />03 <br />MBE AND WBE PARTICIPATION <br />MBE AND WBE PARTICIPATION
The URL can be used to link to this page
Your browser does not support the video tag.