My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - CMc for Madison Lifestyle New Parking Garage Proj No 123-074 - FA Wilhelm
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - CMc for Madison Lifestyle New Parking Garage Proj No 123-074 - FA Wilhelm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 1:08:27 PM
Creation date
12/17/2024 1:08:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7THE CITY OF SOUTH BEND, INDIANA | MADISON LIFESTYLE DISTRICT - PHASE I PARKING GARAGE <br />JP JONES <br />ESTIMATOR <br />• Overall Responsibility for the performance of the preconstruction services team <br />• Provides team leadership, experience and technical expertise <br />• Ensures complete and accurate bids and estimates are produced <br />• Resource allocation and daily communication with project leadership to facilitate on- <br />time completion of deliverables <br />• Coordination and supervision of trade/subcontractors <br />PROJECT EXPERIENCE <br />1. FIRM BACKGROUND, TEAM & EXPERIENCE <br />YEARS OF EXPERIENCE <br />17 <br />TRAINING & <br />CERTIFICATIONS <br />OSHA 30-Hour <br />Hums Elementary School <br />School City of Mishawaka | South Bend, IN <br />Wilhelm is under contract to construct a new, $38 million elementary school, which will <br />feature traditional classrooms with doors, improved safety measures, and enhanced <br />drainage systems to prevent flooding. The project is slated to begin in 2025, with the <br />goal of opening the new school by fall 2027. <br />Project Greenlight <br />Confidential Pharmaceutical Client | Bloomington, IN <br />Wilhelm is the construction manager for this state-of-the-art 150,000 SF building that will <br />house two high-speed automated isolator syringe fill lines and a new high speed isolator <br />vial line equipped with three 30 square meter lyophilizers. Each process suite in the new <br />building will be fitted with dedicated formulation/compounding rooms. The expansion <br />will also include the addition of a dedicated clinical line equipped to support our <br />growing development/clinical business. This line will utilize existing facility infrastructure. <br />PREVIOUS EXPERIENCE <br />Carmel High School Casework <br />Hamilton County School Board | Carmel, IN <br />Carmel High School was wanting to upgrade their display areas in one of the corridors. <br />The scope of this project included constructing 8-foot tall custom display cabinets with <br />glass panel cutouts on each side. LED lights were placed on the inside of the units. In <br />addition to this work, a new reception desk was also constructed with an automatic lift <br />system for the countertops. <br />Indiana Members Credit Union Renovation <br />IMCU | Carmel, IN <br />This project consisted of a remodel to the IMCU lobby and teller desks in Carmel, and <br />the bank did not close during construction. Custom casework was installed along with <br />quartz and solid surface countertops throughout the space.
The URL can be used to link to this page
Your browser does not support the video tag.