My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - CMc for Madison Lifestyle New Parking Garage Proj No 123-074 - FA Wilhelm
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - CMc for Madison Lifestyle New Parking Garage Proj No 123-074 - FA Wilhelm
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 1:08:27 PM
Creation date
12/17/2024 1:08:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6THE CITY OF SOUTH BEND, INDIANA | MADISON LIFESTYLE DISTRICT - PHASE I PARKING GARAGE <br />TYLER BLANK <br />PRECONSTRUCTION MANAGER <br />• Overall Responsibility for the performance of the preconstruction services team. <br />• Provides team leadership, experience and technical expertise. <br />• Ensures complete and accurate bids and estimates are produced. <br />• Resource allocation and daily communication with project leadership to facilitate on- <br />time completion of deliverables. <br />• Coordination and supervision of trade/subcontractors. <br />PROJECT EXPERIENCE <br />1. FIRM BACKGROUND, TEAM & EXPERIENCE <br />YEARS OF EXPERIENCE <br />17 <br />EDUCATION <br />B.S. - Business Administration, Ball <br />State University <br />TRAINING/ <br />CERTIFICATION <br />Primavera <br />Microsoft Project <br />On Screen <br />Agtek <br />Revit <br />Navisworks <br />AutoCAD <br />Sage Timberline <br />Hums Elementary School <br />School City of Mishawaka | South Bend, IN <br />Wilhelm is under contract to construct a new, $38 million elementary school, which will <br />feature traditional classrooms with doors, improved safety measures, and enhanced <br />drainage systems to prevent flooding. The project is slated to begin in 2025, with the <br />goal of opening the new school by fall 2027. <br />Civic Square Garage <br />Carmel Redevelopment Commission | Carmel, IN <br />This new 96,000 SF, 3 story parking garage features 24/7 parking with 303 parking <br />spaces and is near shopping and dining. This technologically advanced garage includes <br />electric vehicle charging stations, solar panels on the roof, and a digital counter to <br />display occupancy. <br />CJC Parking Garages <br />Indy Penn Center, LLC | Indianapolis, IN <br />This new 15-story hotel will be 208,000 sf with 316 hotel rooms and is located in the <br />heart of downtown Indianapolis at Pennsylvania and Georgia Streets. Accompanying the <br />hotel will be an 8-level 382 space parking garage located to the north of the hotel with a <br />pedestrian connector. <br />IU Health Goodman Hall/ Neuroscience Center & Parking Structure <br />Landmark Healthcare Facilities, LLC. | Indianapolis, IN <br />Innovative facility bringing the expertise of research, testing and diagnostics, and <br />treatment therapies together for unrivaled neurological care. The project includes a <br />state-of-the-art, five story neuroscience center, a six-level parking structure, and an <br />elevated pedestrian walkway spanning 16th Street. This project is LEED Gold Certified. <br />University of Kentucky Mixed Use Parking Structure <br />Signet UK Parking, LLC. | Lexington, KY <br />Re-imaging a critical piece of the University of Kentucky’s property, the Mixed-Use <br />Parking Structure will make progress on the University’s Transportation Master Plan <br />as well as serving the needs of students, faculty and staff. This new six-story facility <br />encompasses 903 parking spaces and 15,000 SF of mixed-use space.
The URL can be used to link to this page
Your browser does not support the video tag.