My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Portage and Elwood Neighborhood Infrastructure - Abonmarche Constultants
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Portage and Elwood Neighborhood Infrastructure - Abonmarche Constultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 1:57:13 PM
Creation date
11/26/2024 1:56:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 (Exhibit A – Engineer’s Services) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 8. Revise the Report and any other deliverables in response to Owner’s comments, as appropriate, and furnish copies of the revised Report and any other deliverables to the Owner within calendar days of receipt of Owner’s comments. B. Engineer’s services under the Study and Report Phase will be considered complete on the date when the revised Report and any other deliverables have been delivered to Owner. A1.02 Preliminary Design Phase A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a recommended solution and indication of any specific modifications or changes in the scope, extent, character, or design requirements of the Project desired by Owner, and upon written authorization from Owner, Engineer shall: 1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary drawings, outline specifications, and written descriptions of the Project. 2. Provide necessary field surveys and topographic and utility mapping for design purposes. Utility mapping will be based upon information obtained from utility owners. 3. Advise Owner if additional reports, data, information, or services of the types described in Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or services. 4. Based on the information contained in the Preliminary Design Phase documents, prepare a revised opinion of probable Construction Cost, and assist Owner in collating the various cost categories which comprise Total Project Costs. 5. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: See Appendix L: Scope of Services 6. Furnish 1 review copies of the Preliminary Design Phase documents and any other deliverables to Owner within as described in Exhibit M, Project Schedule calendar days of authorization to proceed with this phase, and review them with Owner. Within calendar days of receipt, Owner shall submit to Engineer any comments regarding the Preliminary Design Phase documents and any other deliverables. 7. Revise the Preliminary Design Phase documents and any other deliverables in response to Owner’s comments, as appropriate, and furnish to Owner 1 copies of the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other deliverables within as described in Exhibit M, Project Schedule calendar days after receipt of Owner’s comments. B. Engineer’s services under the Preliminary Design Phase will be considered complete on the date when the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other deliverables have been delivered to Owner.
The URL can be used to link to this page
Your browser does not support the video tag.