My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Portage and Elwood Neighborhood Infrastructure - Abonmarche Constultants
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Portage and Elwood Neighborhood Infrastructure - Abonmarche Constultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 1:57:13 PM
Creation date
11/26/2024 1:56:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 (Exhibit A – Engineer’s Services) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. This is EXHIBIT A, consisting of pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated , . Engineer’s Services Article 1 of the Agreement is supplemented to include the following agreement of the parties. Engineer shall provide Basic and Additional Services as set forth below. PART 1 – BASIC SERVICES A1.01 Study and Report Phase A. Engineer shall: 1. Consult with Owner to define and clarify Owner’s requirements for the Project and available data. 2. Advise Owner of any need for Owner to provide data or services of the types described in Exhibit B which are not part of Engineer’s Basic Services. 3. Identify, consult with, and analyze requirements of governmental authorities having jurisdiction to approve the portions of the Project designed or specified by Engineer, including but not limited to mitigating measures identified in the environmental assessment. 4. Identify and evaluate [insert specific number or list here] alternate solutions available to Owner and, after consultation with Owner, recommend to Owner those solutions which in Engineer’s judgment meet Owner’s requirements for the Project. 5. Prepare a report (the “Report”) which will, as appropriate, contain schematic layouts, sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed-to requirements, considerations involved, and those alternate solutions available to Owner which Engineer recommends. For each recommended solution Engineer will provide the following, which will be separately itemized: opinion of probable Construction Cost; proposed allowances for contingencies; the estimated total costs of design, professional, and related services to be provided by Engineer and its Consultants; and, on the basis of information furnished by Owner, a summary of allowances for other items and services included within the definition of Total Project Costs. 6. Perform or provide the following additional Study and Report Phase tasks or deliverables: [here list any such tasks or deliverables] 7. Furnish review copies of the Report and any other deliverables to Owner within calendar days of the Effective Date and review it with Owner. Within calendar days of receipt, Owner shall submit to Engineer any comments regarding the Report and any other deliverables.
The URL can be used to link to this page
Your browser does not support the video tag.