My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Locust Water Booster Pump Improv Proj No 124-058 - Engineered Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Award Quotations & Proposals
>
Award Quote - Locust Water Booster Pump Improv Proj No 124-058 - Engineered Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 9:29:45 AM
Creation date
11/26/2024 1:42:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Control terminals <br />Default 1/0 connections <br />This is the default configuration of control connections for water and wastewater applications. <br />Default control connections for water applications <br />1...10 <br />max. <br />5000 <br />28 <br />B+ <br />30 <br />A- <br />Embedded field us, EFB (EIA-485) <br />31 <br />DGND <br />S4 <br />TERM <br />Termination switch <br />S5 <br />BIAS <br />I Bias resistors switch <br />X4 Safe toraue off <br />34 <br />36 <br />OUT1 <br />OUT2 <br />Safe torque off. Factory connection. Both circuits <br />must be closed for the drive to start. See chapter <br />"The Safe Torque Off Function" in the Hardware <br />manual of the drive. <br />36 <br />SGND <br />37 <br />IN1 <br />38 <br />IN2 <br />Safe toraue off <br />ny: txt. 44v AUNU Input to power up <br />unit when the main suoDiv Is disconne <br />
The URL can be used to link to this page
Your browser does not support the video tag.