Laserfiche WebLink
Page 1 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT A, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , . <br />Engineer’s Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below regarding the proposed 2025 <br />Guardrail Improvements in South Bend, Indiana. <br />PART 1 – BASIC SERVICES <br />A1.01 Guardrail Warrant Study for south side of Cleveland Road from Portage Road to Riverside <br />Drive. <br />A.Engineer shall: <br />1.Perform surveying of the shoulder and side ditch south of the south edge of travel <br />lane pavement at selected locations to determine typical slopes and dimensions as well <br />as light pole and tree obstructions within the study area. <br />2.Using the surveying results, AADT and accident records provided by the Owner, <br />posted speed limit, INDOT Design Manual Chapter 49 criteria, and engineering <br />judgement, prepare and provide a guardrail warrant study report with findings, <br />conslusions, and recommendations. <br />3.Provide a preliminary design and construction cost estimate for planning purposes based <br />on the study recommendations. <br />A1.02 Preliminary Guardrail Improvements Cost Estimating and Planning <br />A.Engineer shall: <br />1.Perform preliminary design and construction cost estimates for planning purposes for all 15 <br />guardrail locations on the provided priority list based on the Engineer’s estimated scope of <br />design and construction at each location. <br />2.Recommend options on selected guardrail locations to be included in the proposed 2025 <br />guardrail improvements project within the $600,000 design and construction budget. It is <br />understood that all 15 locations on the priority list may not be included within the budget.