My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - Shaffner
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - Shaffner
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 3:45:10 PM
Creation date
11/12/2024 3:44:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF SOUTH BEND <br />STUDEBAKER NATIONAL MUSEUM <br />SKYLIGHT REPLACEMENT PROJECT COORDINATION 01040-1 <br />SECTION 01040 - PROJECT COORDINATION <br /> <br />PART 1- GENERAL <br /> <br />A. General <br /> <br />1. Related Documents: Drawings and general provisions of the Contract, including General <br />Conditions and Special Provisions and Division 1 specification sections, apply to this <br />section. <br /> <br />2. Work Included: <br /> <br />a. This section includes minimum administrative and supervisory requirements <br />necessary for coordination of the Project. These administrative and supervisory <br />requirements shall include, but not be limited to, the following: <br />1) Coordination. <br />2) Coordination of existing conditions. <br />3) Project meetings. <br />4) Field coordination drawings. <br />5) Administrative and supervisory personnel. <br />6) Coordination of Contract closeout. <br /> <br />3. Coordination: <br /> <br />a. The Contractor shall coordinate its construction activities with those of all <br />Subcontractors, the Owner, work under other contracts, and other entities as <br />required to insure efficient and orderly installation of the Work. The Contractor <br />shall coordinate its operations with operations included under all Sections of the <br />Specifications that are dependent on each other for proper installation, <br />connection and operation. <br />1) Where installation of one part of the Work is dependent on installation of <br />other components, either before or after its own installation, the <br />Contractor shall schedule construction activities in the sequence required <br />to obtain the best results. <br />2) The Contractor shall utilize space efficiently and coordinate installation of <br />different components to ensure maximum accessibility for required <br />maintenance, and repair. Coordinate space requirements and installation <br />of items, which are indicated diagrammatically on Drawings. The <br />contractor shall follow routing indicated for pipes, ducts and wiring as <br />closely as practicable; place runs parallel with line of building unless <br />indicated otherwise. <br />3) Unless otherwise indicated, in finished areas conceal pipes, ducts and <br />wiring within construction. Coordinate locations of plumbing fixtures, <br />electrical fixtures and electrical outlets with finish elements. <br />4) Make adequate provisions to accommodate items scheduled for later <br />installation. <br /> <br />b. Where necessary, prepare memoranda for distribution to each party involved <br />outlining special procedures required for coordination. Include required notices, <br />reports and attendance at meetings. <br /> <br />c. The Contractor shall coordinate scheduling and timing of its administrative <br />procedures to include: <br />1) Preparation of schedules. <br />2) Installation and removal of temporary facilities.
The URL can be used to link to this page
Your browser does not support the video tag.