<br />CITY OF SOUTH BEND <br />STUDEBAKER NATIONAL MUSEUM <br />SKYLIGHT REPLACEMENT CONTRACT MODIFICATION PROCEDURES 01035-2 <br />e. Change Order Procedures: On Owner's approval of a Proposal Request or request <br />for change, Architect will issue a Change Order for signatures of Owner and <br />Contractor on AIA Document G701. <br /> <br />f. Construction Change Directive: Architect may issue a Construction Change <br />Directive on AIA Document G714. Construction Change Directive instructs <br />Contractor to proceed with a change in the Work, for subsequent inclusion in a <br />Change Order. <br />1) Construction Change Directive contains a complete description of change in <br />the Work. It also designates method to be followed to determine change in <br />the Contract Sum or the Contract Time. <br />2) Documentation: Maintain detailed records on a time and material basis of <br />work required by the Construction Change Directive. <br />a) After completion of change, submit an itemized account and <br />supporting data necessary to substantiate cost and time <br />adjustments to the Contract. <br /> <br />2. Products (Not Used) <br /> <br />3. Execution (Not Used) <br /> <br /> <br /> <br />END OF SECTION 01035 <br />