Laserfiche WebLink
DRAFT <br /> <br />Page 2 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />h. Cross-sections <br />i. Coordinate with Utilities to confirm location of their facilities. <br />j. Provide right-of-way impacts. <br />k. Provide legal description for 1210 Miami Street property and sidewalk parcels (5) <br />along Lincoln Way East that need to be dedicated as public right-of-way. <br /> <br />6. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />7. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />8. Furnish electronic copy of the Preliminary Design Phase documents and any other <br />deliverables to Owner within 30 calendar days of authorization to proceed with this <br />phase and review them with Owner. Within 10 calendar days of receipt, Owner shall <br />submit to Engineer any comments regarding the Preliminary Design Phase documents and <br />any other deliverables. <br />9. Revise the 30% Preliminary Design Phase documents and any other deliverables in <br />response to Owner’s comments, as appropriate, and furnish electronic copy of the revised <br />30% Preliminary Design Phase documents, revised opinion of probable Construction Cost, <br />and any other deliverables within 7 calendar days after receipt of Owner’s comments. <br />Legal Descriptions and exhibits to be completed and submitted to Owner within 28 <br />calendar days after receipt of Owner’s comments. <br />B. Engineer’s services under the 30% Preliminary Design Phase will be considered complete on the <br />date when the revised 30% Preliminary Design Phase documents, revised opinion of probable <br />Construction Cost, and any other deliverables have been delivered to Owner. <br />A1.02 60% Preliminary Design Plans <br />A. After acceptance by Owner of the 30% Preliminary Plans, Engineer shall: <br />1. Perform or provide the following 60% Preliminary Design Phase tasks or deliverables: <br />a. Demolition Plans <br />b. Finalize Pavement Marking and Signage Plans <br />c. Traffic Signal Plan <br />d. Lighting Plans - Add ornamental mast arm with luminaires on existing traffic poles at <br />the project intersection and replace those existing along the northwest side of Lincoln <br />Way East from project intersection to the Railroad bridge with 30ft pole ornamental <br />pole with 18ft pedestrian light fixture. Replace existing 5 light poles along Miami <br />Street from the project intersection south to Railroad underpass with ornamental poles <br />similar to those along Miami Road further south of Railroad underpass. <br />e. Erosion Control Plan <br />f. Tables for Pavement, Structure, Sign/Post