Laserfiche WebLink
DRAFT <br /> <br />Page 1 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT A, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br />Engineer’s Services <br /> <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br /> <br />Engineer shall provide Basic and Additional Services as set forth below. <br /> <br />PART 1 – BASIC SERVICES <br />A1.01 30% Preliminary Design Plans <br />A. Engineer shall: <br />1. Perform survey of the project area. <br />2. Perform project cost analysis for intersection improvements and a path from the Miami and <br />Lincoln Way Intersection on the Northwest side of Lincoln Way East on St. Joseph <br />Riverbank to be improved and continued to the Railroad bridge. The three alternatives are <br />provided below, <br />a. Cost estimation for constructing a 10ft path at curb face replacing the existing 5ft <br />sidewalk with grass strip and extending it approximately 470 ft to meet the existing 10ft <br />path at the Railroad bridge. <br />b. Cost estimation for constructing a 5ft sidewalk extending from the existing 5ft sidewalk <br />with grass strip approximately 122ft to meet the existing 10ft path at the Railroad <br />bridge. <br />c. Cost estimation for constructing alternate at 2b together with replacement of existing <br />uneven, sunk, cracked and deteriorated sections of existing 5ft path. <br />3. Analyze traffic counts and traffic study for Miami Road turn lane configuration at Lincoln <br />Way East. Traffic analysis to consider, <br />a. Two (2) left turn lanes and No dedicated right turn lane. <br />b. One (1) left turn lane and One (1) dedicated right turn lane <br /> <br />4. Perform two (2) pavement cores under Geotechnical Investigations <br />5. Perform or provide the following 30% Preliminary Design Phase tasks or deliverables: <br />a. Facilitate kickoff meeting with INDOT and other stakeholders to gather input. <br />b. Demolition plans <br />c. Typical Cross-Sections <br />d. Maintenance of Traffic Schemes <br />e. Plan and Profile Sheets <br />f. Pavement Marking and Signage Plans <br />g. Handicap Ramp Layouts