My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - LW E. & Miami Intersection Imprvmnts. Proj No. 123-078 – A&Z Engineering, LLC - TABLED
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - LW E. & Miami Intersection Imprvmnts. Proj No. 123-078 – A&Z Engineering, LLC - TABLED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:05:47 PM
Creation date
8/13/2024 2:05:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br /> <br />Page 1 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT A, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br />Engineer’s Services <br /> <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br /> <br />Engineer shall provide Basic and Additional Services as set forth below. <br /> <br />PART 1 – BASIC SERVICES <br />A1.01 30% Preliminary Design Plans <br />A. Engineer shall: <br />1. Perform survey of the project area. <br />2. Perform project cost analysis for intersection improvements and a path from the Miami and <br />Lincoln Way Intersection on the Northwest side of Lincoln Way East on St. Joseph <br />Riverbank to be improved and continued to the Railroad bridge. The three alternatives are <br />provided below, <br />a. Cost estimation for constructing a 10ft path at curb face replacing the existing 5ft <br />sidewalk with grass strip and extending it approximately 470 ft to meet the existing 10ft <br />path at the Railroad bridge. <br />b. Cost estimation for constructing a 5ft sidewalk extending from the existing 5ft sidewalk <br />with grass strip approximately 122ft to meet the existing 10ft path at the Railroad <br />bridge. <br />c. Cost estimation for constructing alternate at 2b together with replacement of existing <br />uneven, sunk, cracked and deteriorated sections of existing 5ft path. <br />3. Analyze traffic counts and traffic study for Miami Road turn lane configuration at Lincoln <br />Way East. Traffic analysis to consider, <br />a. Two (2) left turn lanes and No dedicated right turn lane. <br />b. One (1) left turn lane and One (1) dedicated right turn lane <br /> <br />4. Perform two (2) pavement cores under Geotechnical Investigations <br />5. Perform or provide the following 30% Preliminary Design Phase tasks or deliverables: <br />a. Facilitate kickoff meeting with INDOT and other stakeholders to gather input. <br />b. Demolition plans <br />c. Typical Cross-Sections <br />d. Maintenance of Traffic Schemes <br />e. Plan and Profile Sheets <br />f. Pavement Marking and Signage Plans <br />g. Handicap Ramp Layouts
The URL can be used to link to this page
Your browser does not support the video tag.