Laserfiche WebLink
placing any asphalt. <br />3. The contractor shall hire an outside approved independent laboratory to take the sample and <br />perform the testing. Test results shall be given to the city representative within 48 hours. The <br />contractor shall contact the city representative in order to coordinate the sample locations and <br />schedule prior to any sampling. The City reserves the right to choose the sample locations if <br />onsite during the sampling. <br />XXI. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. The plans consist of 3 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br />XXI1. MlWBE GOALS <br />A. Prevailing Specifications: City of South Bend Ordinance No. 10761-21, Minority and Women <br />Business Enterprise Inclusion Program Plan <br />B. Additions: <br />1. No MIWBE Goals are required for this Project. The City encourages Contractors to participate in <br />good faith efforts from MWBEs for this project. <br />2. Complete FORMS MBE-1.0 MBE Utilization Plan and WBE-1.0 WBE Utilization Plan, and submit <br />with Bid Proposal <br />3. Complete FORMS MBE-2.0 Evidence of Good Faith Efforts and WBE-2.0 Evidence of Good Faith <br />Efforts and submit with Bid Proposal. <br />4. Complete FORMS MBE-2.1 MBE Contacted and WBE-2.1 WBE Contacted and submit with Bid <br />Proposal. <br />5. ***Goals should be calculated based on the Base Quote only*** <br />Version 3/15/2024 Page _ g Public Works Quote <br />Scanned with CamScanner <br />