My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - PFAS Minimization Evaluation - Black & Veatch
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - PFAS Minimization Evaluation - Black & Veatch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:19:24 PM
Creation date
5/28/2024 3:19:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 4 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />informed of project progress and issues necessary for success of the project. Engineer will provide project <br />supervision, direction, and coordination with the Owner’s management and staff. Project administration <br />and management also includes budget and schedule control, client management support, document control, <br />coordination of activities, monthly invoicing and project close-out. Engineer will maintain a change <br />register of any scope changes affecting the project budget or schedule and review it with the Owner on a <br />monthly basis. Engineer shall discuss and receive written approval for any scope changes from the Owner <br />prior to proceeding. <br /> <br />6. Consult with Owner to define and clarify Owner’s requirements for the Project and <br />available data. <br />7. Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer’s Basic Services. <br />8. Identify, consult with, and analyze requirements of governmental authorities having <br />jurisdiction to approve the portions of the Project designed or specified by Engineer, <br />including but not limited to mitigating measures identified in the environmental <br />assessment. <br />9. Identify and evaluate [insert specific number or list here] alternate solutions available to <br />Owner and, after consultation with Owner, recommend to Owner those solutions which in <br />Engineer’s judgment meet Owner’s requirements for the Project. <br />10. Prepare a report (the “Report”) which will, as appropriate, contain schematic layouts, <br />sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed-to <br />requirements, considerations involved, and those alternate solutions available to Owner <br />which Engineer recommends. For each recommended solution Engineer will provide the <br />following, which will be separately itemized: opinion of probable Construction Cost; <br />proposed allowances for contingencies; the estimated total costs of design, professional, <br />and related services to be provided by Engineer and its Consultants; and, on the basis of <br />information furnished by Owner, a summary of allowances for other items and services <br />included within the definition of Total Project Costs. <br />11. Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />[here list any such tasks or deliverables] <br />12. Furnish review copies of the Report and any other deliverables to Owner within <br />calendar days of the Effective Date and review it with Owner. Within calendar days of <br />receipt, Owner shall submit to Engineer any comments regarding the Report and any other <br />deliverables. <br />13. Revise the Report and any other deliverables in response to Owner’s comments, as <br />appropriate, and furnish copies of the revised Report and any other deliverables to the <br />Owner within calendar days of receipt of Owner’s comments. <br />B. Engineer’s services under the Study and Report Phase will be considered complete on the date <br />when the revised Report and any other deliverables have been delivered to Owner.
The URL can be used to link to this page
Your browser does not support the video tag.