Laserfiche WebLink
EXHIBIT A <br />SCOPE OF WORK <br />Project: South Bend Wastewater Treatment Plant Improvements Project <br />(CSO 045 EQ Basin and Final Clarifiers 1-3 Rehabilitation -Peripheral Feed Alternative) <br />CSO 045 EQUALIZATION BASIN — SCOPE OF WORK <br />The scope is based upon: <br />■ American Structurepoint CSO 045 EQ Basin Drawings, dated 8.25.23 (119 Plan Sheets) <br />• American Structurepoint CSO 045 EQ Basin Specifications (821 Pages) <br />• 7NT Geotechnical Report for CSO 045 EQ Basin, dated 11.3.22 (61 Pages) <br />• Stantec Geotechnical Baseline for CSO 045 EQ Basin, dated August 2023 (29 Pages) <br />• Exhibit A —Scope of Work <br />• Bowen File — South Bend WWTP EQ Basin_Drawing_DV-LS Combo (4 Plan Sheets) <br />• Bowen File — South Bend WWTP EQ Basin_Drawing_Proposed Re -Route (1 Plan Sheet) <br />1. General <br />Bowen has not included costs for any contaminated/hazardous material handling <br />and/or disposal. <br />Bowen has not included any budgets for Right of Ways, Right of Entries, Easements, <br />Temp Easements. <br />No costs for permits or railroad monitoring are included in this scope. <br />All permits, including INDOT, are by others. <br />AIS domestic steel requirements have been followed; however BABA requirements are <br />not included. <br />f. Davis Bacon prevailing wages are included. <br />g. Construction Contingency: The Contractor's GMP Proposal contains, as part of the <br />estimated Cost of the Project, the Contractor's Contingency, a sum agreed upon to <br />cover costs which are properly reimbursable as a Cost of the Project, whether or not <br />such cost is the basis for a Change Order. The Contractor shall regularly (no less than on <br />a monthly basis during the term of this Agreement) provide the Owner with an <br />accounting of all charges against the Contractor's Contingency. <br />CSO 045 Equalization Basin <br />a. Bowen has included the cost to provide and install the stairway access, platform and <br />ladder into the EQ basin, however the design of this is not included. <br />b. The Diversion Structure and Lift Station weir walls have been included with an additional <br />2' of height per ASI. <br />c. The scope includes the cost to leave one dewatering casing in place for the non -potable <br />supply of water to the flushing mechanism. A 5 HP pump and pitless adapter has been <br />included by a licensed pump provider. <br />d. Two hatches have been included in the Precast Plank roofing of the IN KOTE structure. <br />e. No costs have been included for a surveillance system. <br />f. An additional 890 CY of cut and bank grading has been included per updated Plan Sheet <br />C-13. Permanent seeding and erosion control matting is also included here. <br />