My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:53:14 AM
Creation date
10/24/2023 1:28:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M!K Dream Center - South Bend, Indiana <br />ID <br />Name <br />Duration Early Start <br />Early Finish <br />)23 Half 2 2a23 Half 1, 2024 Ha[/ 2, 2024 Half 1, 2025 <br />8 <br />(Task <br />MJJASCNOJFMAMJJASONDJrMAM <br />98 <br />Install Roof Pavers <br />10 days Mcn 815124 <br />Fri 8/16/24 <br />r <br />99 <br />Install Trellis System an Balony of Brotherhood <br />5 days Mcn 8119124 <br />Fri 8123124 <br />67 <br />Exterior Metal Wall Panels <br />45 days Wed 8121124 <br />Tue 10122124 <br />96 <br />Install Metal Panels/Siding <br />40 days Wed 9121124 <br />Tue 10/15/24 <br />90 <br />Hong Tape and Finish Drywall <br />25 days Mcn 8126124 <br />Fri 9127124 <br />76 <br />Install Roof Top Equipment <br />5 days Wed 8128124 <br />Tue 913124 <br />1 <br />78 <br />Exterior Aluminum Froming and Gio2ing <br />30 days Wed 9111124 <br />Tue 10/22/24 <br />r� <br />82 <br />Prime and First Coat Paint <br />15 days Mcn 9130124 <br />Fri 10/18124 <br />■ <br />68 <br />Field Measure and Fabricate Coping <br />20 days Wed 10/16/24 <br />Tue 11112124 <br />64 <br />Install Athletic Flooring (She et and Wood) & Stripe Flooring <br />30 days Mcn 10121124 <br />Fri I1129124 <br />65 <br />Install tVT/! VP Flooring <br />20 days Men 10121124 <br />Fri I1115124 <br />69 <br />Install WaII Protection, Wall Padding, Acoustical Panels, Misc. <br />12 days Men 10/21/24 <br />Tue 1115124 <br />■ <br />Interior Equiment for Gyms <br />74 <br />Final Coat of Paint and Paint Misr. ltem5 <br />18 doys Mcn 10/21/24 <br />Wed I1113124 <br />■ <br />81 <br />Install Ceiling Grid <br />15 days Mcn 10/21/24 <br />Fri I1104 <br />■ <br />83 <br />Install 8oseketbollsIoops in interior <br />5 days Mcn I0/21/24 <br />Fri 10/25/24 <br />84 <br />Install Interior and Exterior5ignage, Murals, Etc. <br />15 days Mcn 10121124 <br />Fri III8124 <br />■ <br />86 <br />Install Doors and Hardware <br />15 days Mcn 10121124 <br />Fri 1 M812 4 <br />■ <br />100 <br />Install Carpet Tile <br />15 days Mcn 10121124 <br />Fri 11/8124 <br />■ <br />61 <br />Palish Concrete Flooring & Seal Concrete Floors <br />25 days Wed 10/23/24 <br />Tue 11/26/24 <br />r■ <br />97 <br />Paint Exposed Ceilings <br />10 doys Wed 10130124 <br />Tue I1112124 <br />■ <br />80 <br />Install Wall Tile <br />15 days Mcn 11111/24 <br />Fri 11/29/24 <br />■ <br />73 <br />Install Coping <br />10 days Wed 11/13/24 <br />Tue IV26124 <br />■ <br />75 <br />j <br />Install Decorative Railings <br />15 days Mcn I1/18/24 <br />Fri 1216124 <br />E <br />85 <br />Install Plumbing Fixtures <br />12 days Mcn 11/18/24 <br />Tue I2/3124 <br />E <br />71 <br />Install interior Playground <br />10 doys Wed 11127124 <br />Tue 1211W4 <br />79 <br />Install Casework Millwork <br />11 days Wed 11127124 <br />Thu 12112124 <br />87 <br />Install Toilet Accessories & Partitions <br />10 days Wed 1214124 <br />Tue 12117124 <br />89 <br />MEP Finishes in Ceilings <br />15 days Wed 1/05 <br />Tue 1121125 <br />72 <br />Install Kitchen & Concessions Equipment <br />12 days Wed 1/8/25 <br />Thu 1123125 <br />704 <br />Install Ceiling Tiles <br />6 days Wed 1122125 <br />Wed 1129125 <br />70 <br />Install Movable Portitign <br />5 days Thu 1130125 <br />Wed 215125 <br />88 <br />iJ <br />Final Cleaning <br />5 days Thu 216125 <br />Wed 2112125 <br />705 <br />Project Completion <br />0 days Wed 2112125 <br />Wed 2112/25 <br />♦ 2172 <br />Garmong Construction Services Page 3 of 4 Print Dote: Tue 10/17/'23 . <br />Contract Project Schedule 10.1723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.