My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:53:14 AM
Creation date
10/24/2023 1:28:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MLK Dream Center - South Bend, Indiana <br />ID <br />iTask Name <br />Duration Early Start <br />Early Finish <br />)23 Half 2, 2723 <br />Half 7, 2024 Haif 2, 2024 Half 1, 202� <br />8 <br />MJJASdNDJFMAMJJ.A.SONDJrMAM. <br />39 <br />Mass Earthwork <br />8 days Mcn 12111/23 <br />Wed I2I2W23 <br />40 <br />Install the Site Sanitary <br />10 days Marl 12/11/23 <br />Fri I2122/23 <br />44 <br />Underground Fledricol <br />5 doys Mcn 12/11/23 <br />Fri I2115123 <br />0 <br />41 <br />Install the Site Waterlines <br />10 days Mcn 12/25/22 <br />Fri 115/24 <br />❑ <br />42 <br />Install the Site Storm Sewers <br />15 days Mcn 1212SI23 <br />Fri 1/12124 <br />❑ <br />46 <br />Downspout Collection Tie-in <br />5 days Wed 3/6/24 <br />Tue 3112124 <br />t <br />45 <br />Site Concrete - Curbs, Sidewalks, Splash Pad Etc. (Minus Linden) <br />20 days Wed 4117124 <br />Tue 5114124 <br />INS <br />50 <br />Shut Down Linden Avenue for Re -Work <br />60 days Wed 5115124 <br />Tue 8IV24 <br />NEMEC: i <br />47 <br />Asphalt Paving and Striping (Parking Lot & 8aseketbalf Courts) <br />10 days Wed 8/7/24 <br />Tue 8120124 <br />48 <br />Spedol Playground Surfacing <br />5 days Wed 8111I24 <br />Tue 8127124 <br />57 <br />Install Basketball Hoops, Fenring Splash Pad Fixtures Etc. <br />5 days Wed 8121124 <br />Tue 8127124 <br />52 <br />Spread Topsoil <br />15 days Wed 8121124 <br />Tue 91I0124 <br />u <br />49 <br />Playgound Equipment & Ropes Course <br />20 days Wed 8/28/24 <br />Tue 9124124 <br />Mu <br />54 <br />Plantings <br />15 days Wed 10/23/24 <br />Tue 11112124 <br />53 <br />Final Seeding <br />5 days Wed 11/I3124 <br />Tue 11/19/24 <br />55 <br />Install Site Furnishings (Tree Gmtes, Benches. Trash Sins Etc.) <br />5 days Wed 11/13/24 <br />Tue 11/19/24 <br />737 <br />Order and Deliver Roofing <br />150 days Wed 12/13/23 <br />Tue 719124 <br />56 <br />Building Canstructian <br />311 days Wed 12/20/23 <br />Wed 2/26/25 <br />57 <br />Main Building <br />311 days Wed 12/20/23 <br />Wed 2126125 <br />702 <br />Foundations and5rem Wall <br />25 days Wed 12/20/23 <br />Tue 1123124 <br />MEN <br />58 <br />Under Slob Utilities <br />15 days Wed 1124124 <br />Tue 2113124 <br />■ <br />103 <br />CMU Walls - Elevator <br />10 days Wed 1124124 <br />Tue 2/6/24 <br />■ <br />T0P <br />Erect deck and Detail the Structural Steel <br />35 days Wed 217/24 <br />Tue 3/26/24 <br />77 <br />Prep and Pour the SOG <br />15 days Wed 2I14I24 <br />Tue 3IS124 <br />■ <br />93 <br />Prep and Pour the SOD <br />15 days Wed 3127124 <br />Tue 4I16I24 <br />IN <br />94 <br />Exterior Perimeter Metal Studs and Sheathing & Waterproofing <br />40 days Wed 4117124 <br />Tue 6111124 <br />60 <br />Interior Metal Stud Froming <br />20 days Wed 5115124 <br />Tue 6111/24 <br />I■ <br />66 <br />install Door Frames <br />12 days Wed 5129124 <br />Thu 6113124 <br />■ <br />97 <br />install Roofing <br />18 days Wed 7110124 <br />Fri W2/24 <br />■ <br />59 <br />Install hoof Top Curbs <br />2 days Man 8/5124 <br />Tue 816124 <br />I <br />62 <br />Install Elevator <br />100 days Mcn 815/24 <br />Fri I2120124 <br />S3 <br />Above Ceiling/High MEP Rough in <br />20 days Mcn 915124 <br />Fri 8/304 <br />92 <br />In Wall MEP (tough -in <br />15 days Mcn 815124 <br />Fri 8123124 <br />■ <br />95 <br />Install Solar Panels <br />25 days Mcn 8/5124 <br />Fri 9/6/24 <br />Print Dote: Tue 10/17/'23 <br />Garmong Construction Services Page 2 of 4 <br />. <br />Contract Project Schedule 10.1723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.