Laserfiche WebLink
Capital Expenditure Summary <br />Dept Subdivision Type Description 2023 Cost <br />Guardrail Installation 300,000 <br />Match for CCG from INDOT 1,000,000 <br />Traffic Calming 800,000 <br />Machinery & Equipment (1) Mower 60,000 <br />(1) Front End Loader 310,000 <br />(1) 3/4 Ton Pickup 4WD w/ plow 40,000 <br />Utilities & Infrastructure 2023 Sewage Works Bonds: <br />Sewer Lining Projects 2,000,000 <br />(1) Backhoe 200,000 <br />(2) 3/4 Ton Pick Up Truck - Standard cab, 4 WD, CNG 150,000 <br />(2) Tandem Axle Dump Truck w/Leaf Boxes 760,000 <br />(1) ASL Dedicated CNG Unit-Mini Mac 275,000 <br />(2) ASL Dedicated CNG Unit ($475k each)950,000 <br />2023 Storm Sewer Project: Johnson & Fellows Drainage, <br />Royal Oaks Drainage, Bercliff Estates Storm Sewer, and <br />Garland Circle Drainage Swale <br />1,150,000 <br />Professional services (design) for Storm Sewer Project: <br />Johnson & Fellows Drainage, Royal Oaks Drainage, Bercliff <br />Estates Storm Sewer, and Garland Circle Drainage Swale <br />300,000 <br />(1) Alley Maintainer w/Broom Attachment - Replace 289 225,000 <br />(1) Skid Loader w/Trailer & Attachments w/Remote Control - <br />Replace 292 150,000 <br />(1) Spray Trailer - New to Fleet 120,000 <br />(1) Alley Maintainer w/Broom Attachment 225,000 <br />(1) Concrete Grinder 15,000 <br />(1) F-550 4x4 x/Custom Flat Bed - Replace 234 110,000 <br />(2) 4WD SUV - Hybrid - New to Fleet 120,000 <br />(2) Single Axle Dump Truck w/Leaf Boxes- Replace 248, 256 480,000 <br />(2) Tandem Axle Dump Truck w/Leaf Boxes- Replace 230, <br />265 680,000 <br />(1) Street Sweeper 125,000 <br />(1) Arrow Board Traffic Controller 15,000 <br />(1) Utility Cart 15,000 <br />WWTP Secondary Treatment Plant Improvement - Design <br />services 1,500,000 <br />2023 Sewage Works Bonds: <br />EQ Basin $18.1M, and WWTP Improvements $11M 29,100,000 <br />Vehicles (1) Transit Connect Van 45,000 <br />Hydrant and Valve Replacement 200,000 <br />Water Mains 300,000 <br />Water Meter Replacement 500,000 <br />Comprehensive Water Master Plan $250K, and Lead <br />Service Line Replacement (LSLR) Plan $100K 350,000 <br />2023 Water Works Revenue Bonds: <br />Costs of Issuance $150K, and Other Design Services $500K 650,000 <br />2023 Water Works Revenue Bonds: <br />2024 Edison, North, Pinhook Filtration, Olive GAC Plant (see <br />Capital Plan for 2025 and 2026) <br />2024 spending = $4,739,000 <br />2025 spending = $4,914,000 <br />9,653,000 <br />2023 Water Works Revenue Bonds: <br />Fellows: Inspection & Cleaning of Clearwell $48K, and Pump <br />Station Improvements $8.137M <br />8,185,000 <br />(1) Mid Size Car w/CNG 30,000 <br />(1) Mini Cargo Van w/CNG 70,000 <br />(1) Vactor 400,000 <br />61,558,000 <br />Utilities & Infrastructure <br />Vehicles <br />Public Works <br />Grand Total <br />Local Roads & Streets <br />Organic Resources <br />Sewers <br />Solid Waste <br />Storm Sewer <br />Streets <br />Wastewater <br />Water Works <br />Utilities & Infrastructure <br />Vehicles <br />Vehicles <br />Utilities & Infrastructure <br />Machinery & Equipment <br />Vehicles <br />Machinery & Equipment <br />Utilities & Infrastructure <br />66