My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Nexus Center Roof Replacement Proj No. 121-064 - Slatile Roofing & Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Bids
>
Award Bid - Nexus Center Roof Replacement Proj No. 121-064 - Slatile Roofing & Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 10:01:34 AM
Creation date
1/10/2023 1:55:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o ;ourH e� <br />0 <br />U 1 p <br />BID/PROPOSAL <br />CITY OF SOUTH BEND` •:.r,- a2 <br />Project Name: Nexus Center Roof Replacement <br />Project Number: 121-064A <br />For Bids Due: December 13, 2022 <br />Contractor Name: Slatile Roofing & Sheet Metal Co., Inc. <br />ALTERNATE #3 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />SECTION 313: Repair existing metal roof <br />$g,812.00 <br />as necessary. This area has existing 6" <br />fiberglass insulation with vinyl cover. <br />5 <br />This roof is a 2/12 slope and it is <br />1 <br />LS <br />supported by a PEMB (pre-engineered <br />metal building) system. <br />ALTERNATE #3 TOTAL $9,812.00 <br />ALTERNATE #4 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />SECTION 3C: Replace existing rusted <br />metal roof with a new metal roof system <br />$23, 812.00 <br />as necessary. This area has existing <br />6 <br />fiberglass insulation with vinyl cover <br />1 <br />LS <br />underneath the existing metal roof. This <br />roof is over pre-engineered metal <br />building PEMB system. <br />ALTERNATE #4 TOTAL $23,812.00 <br />ALTERNATE #5 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />SECTION 3D: Repair existing metal roof <br />$24,812.00 <br />7 <br />as necessary. <br />1 <br />LS <br />Replace, recoat with a spray -on <br />membrane ors of repair. <br />ALTERNATE #5 TOTAL $24, 812.00 <br />ALTERNATE #6 <br />Item <br />No. <br />Descri tion <br />p <br />Unit <br />Unit Price <br />Total Amount <br />8 <br />SECTION 4A: Demolish existing metal <br />1!tF <br />root. <br />LS <br />$25,812.00 <br />ALTERNATE #1 TOTAL $25,812.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.