My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Nexus Center Roof Replacement Proj No. 121-064 - Slatile Roofing & Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Bids
>
Award Bid - Nexus Center Roof Replacement Proj No. 121-064 - Slatile Roofing & Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 10:01:34 AM
Creation date
1/10/2023 1:55:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Nexus Center Roof Replacement <br />Project Number: 121-064A <br />For Bids Due: December 13, 2022 <br />Contractor Name: Slatile Roofing & Sheet Metal Co., Inc. <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />SECTION 1A: Remove existing metal <br />$204,812.00 <br />coping. Remove existing EPDM roof and <br />retain the existing 6" of polyiso rigid <br />board roof insulation. Provide fully <br />adhered 0.060" white TPO roof <br />1 <br />membrane system. Re -install existing <br />1 <br />LS <br />metal coping. (Replace as necessary in <br />like and kind). Replace wet and <br />damaged rigid board roof insulation <br />(10% included in bid). Roof membrane <br />to be 20 year warranted system. <br />2 <br />Construction Contingency <br />$10,000.00 <br />BASE BID TOTAL $214,812.00 <br />ALTERNATE #1 <br />Item <br />No. <br />_____T Descri tion <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />SECTION 2A: Remove existing metal <br />coping. Remove existing BUR roof down <br />to deck. Where deck is damaged, repair <br />as required (assume 5% deck repair in <br />Roofing <br />$83,412.00 <br />bid). Add 2 layers of new 2" polyiso- <br />3 <br />insulation (4" total). Provide fully <br />adhered 0.060" white TPO roof <br />1 <br />LS <br />Coping <br />$ 5,400.00 <br />membrane system. Install new metal <br />coping and add treated 2 x blocking to <br />ensure a minimum of 6" parapet wall on <br />southern end of roof. Roof membrane to <br />be 20 year warranted system. <br />ALTERNATE #1 TOTAL $88,812.00 <br />ALTERNATE #2 <br />Item <br />No. <br />Description <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />SECTION 3A: Remove existing low <br />1 8, 812.00 <br />sloped metal roof, inspect existing <br />structure and provide new metal deck as <br />required. Add a 0.060" white TPO roof <br />4 <br />membrane system for a complete <br />1 <br />LS <br />weatherproof and weathertight system. <br />Add 2 layers of new 2" polyiso-insulation <br />(4" total). Roof membrane to be 20 year <br />warranted system. <br />ALTERNATE #2 TOTAL $18,812.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.