My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. 420 South Eddy Street_COA 2022-0606
sbend
>
Public
>
Historic Preservation
>
2022
>
June
>
3. 420 South Eddy Street_COA 2022-0606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 2:16:35 PM
Creation date
6/14/2022 2:15:52 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
420 South Eddy Street
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />08-51-00 - 6 ALUMINUM WINDOWS – SERVICE BUILDING 08-51-00 - 6 <br />G. Samples: <br /> <br />1. Provide two (2) samples (12”X12” min.) of the insulated glass unit in the tint color <br />specified. <br /> <br />2. Color Finish Samples – Provide (3) sets minimum for the following (Architect will <br />return (1) one set after color selections have been approved: <br /> <br /> a. Provide color samples for the exterior finish. <br /> <br /> b. Provide color samples for the interior finish. <br /> <br /> c. Provide color samples for the insect screens. <br /> <br />1.05 FIELD MEASUREMENT: <br /> <br />A. Obtain all necessary field measurements at the job site and be responsible for the accuracy <br />and fit of this work with the work of other trades, and building conditions. The Contractor(s), <br />window manufacturer and supplier shall be thoroughly knowledgeable of the variety of <br />construction conditions occurring throughout this Project. Windows shall fit tight to <br />surrounding construction. Field measurements shall be taken at each location for accuracy <br />and fit. Field dimensions shall be verified for each and every location prior to preparation of <br />shop Drawings and ordering of frames and glass. The Architect shall be provided <br />documentation of field verified conditions and dimensions on the shop Drawings. The field <br />measurements shall be noted on the shop Drawings in architectural dimensioning format as <br />part of the original shop drawing preparation. The field measurement dimension lines shall <br />have the suffix F.M. with each field measured dimension notation. Where field <br />measurements identify sufficient dimensional deviation from the construction Drawings, the <br />manufacturer’s Shop Drawings shall include the additional window elevation types with <br />separate identification (i.e. X-1, A-2, etc.). Failure to include the field measurements or to <br />have requests for the Architect to complete dimensioning, will be just cause for rejection of <br />the Shop Drawings without adjustment to the Contractors contract schedule. <br /> <br />1.06 PRODUCT HANDLING: <br /> <br />A. Protection: Use all means necessary to protect the materials of this Section before, during, <br />and after installation. Protect the installed work of other trades during the storage and <br />installation of the windows as that work which may be directly affected by the windows, <br />storage and installation. <br /> <br />B. Replacements: In the event of damage, immediately make all repairs and replacements <br />necessary at no additional cost to the Owner. <br /> <br />1.07 WARRANTIES: <br /> <br />A. Manufacturer’s Warranties: <br /> <br />1. Windows: Submit a written Warranty - executed by the window manufacturer - that <br />guarantees materials and workmanship of windows for five (5) years. The Warranty <br />shall include window extrusions, weatherstripping, trim, finish and all hardware <br />supplied by the window manufacturer. The window manufacturer’s Warranty will <br />cover repair or replacement of all defective window parts for the entire warranty term. <br />The Warranty does not include the installation labor of windows and/or erection labor <br />of walls. <br /> <br />2. Finish: <br />
The URL can be used to link to this page
Your browser does not support the video tag.