Laserfiche WebLink
6 °�� <br /> Example calculations of monthly charge <br /> 5/8 inch meter Flow <br /> fixed rate Rate/ 100 cu. ft. <br /> Old $7.90 $0.74 <br /> Assume 800 cubic feet of water consumed. <br /> Monthly Charge = $7.90 + ($ 0.74 * 8 ccf) = $7.90 + $5.92 = $13.82 <br /> New Rate inside City <br /> $1.16 $2.07 <br /> Monthly Charge = $1.16 + ($2.07 * 8ccf) = $1.16 + $ 16.56 = $17.72 <br /> New rate Outside the City <br /> $1.74 $3.11 <br /> Monthly Charge = $1.74 + ($3.11 * 8ccf) = $1.74 + $24.88 = $26.62 <br />