My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
July 1988
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1988
>
July 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 3:19:26 PM
Creation date
3/26/2021 4:06:31 PM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
HPC Document Description
HPC Meeting Minutes
BOLT Control Number
1001757
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
eis p <br />ric reservation co fission <br />of south bend and st. joseph county <br />ROOM 1123 COUNTY CITY BUILDING <br />south bend, indiana 46601 (219) 284-9798 <br />July 18, 1988 <br />STAFF REPORT <br />Central High School <br />115 N. St. James Court <br />South Bend, IN 46601 <br />Local Landmark <br />National Register of Historic Places <br />PROPOSAL <br />The proposal is two -fold but related: <br />Part 1 <br />The architect for the School Corporation proposes a new site <br />plan which includes: <br />a) relocation of parking spaces on St. James Court away <br />from the elliptical stone entry; <br />b) repair of elliptical stone entry and return of the <br />flagpole to its original position; <br />c) installation of a handicapped ramp to replace south <br />steps to lower level at original main entrance; <br />d) restoration of 1914 landscape plan from known physical <br />data; <br />e) removal of chain -link fence; <br />f) construction of new entry on west facade reusing stone <br />portal from VoTec building. <br />Part 2 <br />The proposal includes the removal of VoTec Building and <br />boilerhouse and construction of new parking lot with <br />additional landscaping on west side of building in context <br />with original plan; <br />The School Corporation's reasons for the demolition of the <br />VoTec Building and Boilerhouse include: <br />a) The South Bend Community School Corporation does not <br />require additional space outside the Central High <br />School building to fulfill its program requirements; <br />b) The SB Community School Corp. needs additional on -site <br />parking in order to fulfill program and code <br />requirements; <br />c) A new entry is desired from the west or parking side of <br />the property; <br />d) The Vocational/Technical and Boi1erhouse Buildings have <br />little or no aesthetic value and detract from the <br />quality of the Central High School building; <br />
The URL can be used to link to this page
Your browser does not support the video tag.