My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - El Campito Water Tap Quote Proj No. 121-017 - Selge Construction Co. Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Award Quotations & Proposals
>
Award Quote - El Campito Water Tap Quote Proj No. 121-017 - Selge Construction Co. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 4:59:29 PM
Creation date
3/23/2021 4:57:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Service Shut-Off Box (See Note 1) <br />(Tyler 95E or Approved Equal) <br />1" Type "K" Service <br />Pipe to Establishment <br />1" Compression Curb Stop <br />(Ball Valve) <br />Brick <br />1" Type "K" Copper Service <br />(Perpendicular to Main) <br />Ball Type Corporation Stop <br />(1" CC Threads X 1" Copper <br />Compression or Approved Equal) <br />Water Main <br />For 1" & 2" Services, <br />a Twin Strap Nylon or <br />Epoxy Coated Saddle <br />is Required 60" Minimum - 72" MaximumCast Iron Access Cap (4" - 2 Hole) <br />Finish Ground <br />(See <br />N <br />o <br />t <br />e <br /> <br />2 <br />) <br />Shut-Off Box Rod <br />45° <br />NOTES: <br />1. Service shut-off box shall be placed in the public right-of-way in grass <br />between curb and sidewalk. <br />2. For a 2" service the corporation stop shall be located at 90° (level).6/26/18 <br />CITY OF SOUTH BENDItemRevision <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />TYPICAL WATER SERVICE CONNECTION 5-3 <br />5-2.1 and 5-2.5(g) <br />June 26, 2018 <br />SECTION 5 - WATER WORKS
The URL can be used to link to this page
Your browser does not support the video tag.