My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - El Campito Water Tap Quote Proj No. 121-017 - Selge Construction Co. Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Award Quotations & Proposals
>
Award Quote - El Campito Water Tap Quote Proj No. 121-017 - Selge Construction Co. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 4:59:29 PM
Creation date
3/23/2021 4:57:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES: <br />1. Tapping valves shall be Clow, Mueller, or approved equal. <br />2. The physical tapping of the existing water main shall be performed by the city's utility <br />distribution department. All excavation and preparation work shall be performed by <br />the contractor, and the contractor shall provide all materials. The utility will only <br />perform the physical tap. Contractor shall coordinate with the Water Department. <br />Tapping Valve <br />New Main <br />H304 Stainless <br />Steel Tapping <br />Sleeve <br />Ex. Main <br />TAP MADE UNDER PRESSURE (WET TAP) <br />CONNECTING NEW MAIN TO EXISTING MAIN <br />Flanged JointRestrain With Wedge <br />Action Restraints <br />6/26/18 <br />CITY OF SOUTH BENDItemRevision <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />TAPPING SLEEVE AND VALVE 5-2 <br />5-2.5(e) <br />June 26, 2018 <br />SECTION 5 - WATER WORKS
The URL can be used to link to this page
Your browser does not support the video tag.