My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
11-08-12 Packet
>
6C(2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:15:41 PM
Creation date
11/5/2012 4:54:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br />aribeth Roncz/ Developer November 2, 2012 <br />Harmon Building Renovations (Phase 1) <br />Scope of Work - General Cost <br />1 Restore water and sewer service <br />TBD <br />2 Restore electrical service <br />TBD <br />3 Restore gas service <br />TBD <br />4 General site clean -up <br />TBD <br />;cope of Work - Exterior <br />Power spray concrete walls and floor in garage area <br />1 <br />Remove Harmon Parking Lot Sign <br />$600.00 <br />2 <br />Remove Harmon Building Sign <br />$200.00 <br />3 <br />Remove wood fencing <br />$200.00 <br />4 <br />Clear scrub trees and brush from rear of building <br />$250.00 <br />5 <br />Install new glass block rear windows <br />$1,200.00 <br />6 <br />Clean building and repair CMU block <br />$1,800.00 <br />7 <br />Paint sides and rear of building <br />$1,100.00 <br />8 <br />Paint existing garage doors, service door and metal trim <br />$1,250.00 <br />9 <br />Install new exterior building lighting <br />$1,520.00 <br />10 <br />Install planter, window awning and pergola <br />$8,500.00 <br />11 <br />Clean and make roof repairs, install new gutter and downspout <br />$1,100.00 <br />12 <br />Miscellaneous repairs <br />$500.00 <br />pe of Work - Interior <br />1 <br />Power spray concrete walls and floor in garage area <br />$100.00 <br />2 <br />Clean office area: remove paneling, carpeting and dropped ceiling <br />$330.00 <br />3 <br />Repair and paint office walls <br />$600.00 <br />4 <br />Install interior trim materials (walls) <br />$1,600.00 <br />5 <br />Grind concrete floor, stain and seal concrete floor in office <br />$1,750.00 <br />6 <br />Paint walls in garage area <br />$600.00 <br />7 <br />Build secure storage area for tools and equipment in garage area <br />$2,300.00 <br />8 <br />Fix garage door openers and other required maintenance items <br />$400.00 <br />9 <br />Service electrical panel <br />$500.00 <br />10 <br />Service mechanical (HVAC and plumbing) <br />$2,500.00 <br />11 <br />Improve interior lighting <br />$600.00 <br />12 <br />Miscellaneous repairs <br />$500.00 <br />Total Costs of Improvements (Phase 1): <br />$30,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.