My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
07-26-12 Packet
>
6B (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:08:01 PM
Creation date
11/1/2012 10:40:39 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOUTH BEND REDEVELOPMENT COMMISSION — IVY TOWER FACILITY RENOVATION PROJECT <br />Proposal for Environmental Services <br />4.0 PROJECT TEAM <br />4.1 Organization <br />Weaver Boos staff has the technical proficiency, experience and professionalism to successfully <br />and cost effectively complete the overall project. Each project is managed by a Weaver Boos <br />Principal, Senior Project Manager or Project Manager, who draws upon various core personnel, <br />technical staff, subcontractors, and suppliers to form a project team. The individual members of <br />the team are selected to provide each project with personnel whose background and experience <br />are consistent with the project requirements. For the Project, we propose the team identified on <br />the following page. <br />Weaver Boas Consultants, LLC 16 <br />4085 Meghan Heeler Court <br />South Bend, IN 46629 <br />
The URL can be used to link to this page
Your browser does not support the video tag.