My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos 4 & 5 - Corby, Ironwood, Rockne Intersection Improvements - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order Nos 4 & 5 - Corby, Ironwood, Rockne Intersection Improvements - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 3:19:08 PM
Creation date
11/12/2020 11:25:47 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
` Remove banner arms off of light poles. <br />Rates Updated: <br />LaborOZ. <br />Hours <br />Rate <br />Burdens <br />Total <br />General Foreman <br />$57.47 <br />$33.66 <br />$91.13 <br />Foreman <br />4 <br />$50.38 <br />$30.35 <br />$80.73 <br />Lineman <br />$45.98 <br />$28.29 <br />$74.27 <br />Equipment Operator <br />$45.98 <br />$28.29 <br />$74.27 <br />Groundman Equip.Operator <br />4 <br />$44.53 <br />$27.61 <br />$72.14 <br />Senior Groundman Truck Driver <br />$31.88 <br />$21.70 <br />$53.68 <br />Groundman <br />$26.56 <br />$19.21 <br />$45.77 <br />E_Quipment <br />Rates Updated: 1/2119 <br />Labor Total <br />Description <br />Hours <br />Rate <br />On -Highway Light Duty Truck <br />$21.88 <br />On -Highway Flatbed Truck <br />$34.10 <br />On -Highway Rear Dump <br />$40,18 <br />Wheel Mtd. Hyd. Excavator <br />$95.45 <br />Truck w/ Articulating Lift <br />4 <br />$48.03 <br />Truck w/ Teleoscopic Lift <br />$58.58 <br />Trailer <br />$11.16 <br />Skid Steer Loader <br />$32.91 <br />Generator <br />$5.40 <br />Cut-off Saw <br />$2.64 <br />Conduit Bender <br />$8.01 <br />Air Compressor <br />$17.36 <br />Walk -Behind Saw <br />$22.31 <br />Crack Filler (Loop ) <br />$10.27 <br />Directional Boring Machine <br />$93.43 <br />Boring Truck <br />$47,57 <br />INNO 1ZR fusion splice kit <br />$10,22 <br />EXFO Fiber inspection pro <br />$5.78 <br />EXFO 720C <br />$8.04 <br />INTECH 8x12 TA2 <br />$15.28 <br />Material <br />1 <br />2. <br />3. <br />4. <br />5. <br />6. <br />Description <br />Sub Totals <br />Labor Total $611.48 <br />Equipment Total $192.12 <br />Material Total $0.00 <br />Equipment Total <br />Quantity Cost <br />Material Total <br />+ mark-up <br />$122.30 <br />$23.05 <br />$0.00 <br />Total: <br />1/1/2020 <br />Subtotal <br />$0.00 <br />$322.92 <br />$0.00 <br />$0.00 <br />$288.56 <br />$0.00 <br />$0.00 <br />$611.48 <br />Extension <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$192.12 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$192.12 <br />Extension <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$733.78 <br />$215.17 <br />$0.00 <br />$948.95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.