Laserfiche WebLink
MATERIAL 109.05 (b)(3) <br />Purchased or <br />Manufactured <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Extenstion <br />$ 240.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />s <br />$ <br />$ <br />MATERIALS PURCHASED <br />MATERIALS MANUFACTURED <br />TOTAL: LINE (18) + (19) <br />12 % x LINE (20) <br />GRAND TOTAL FOR MATERIALS: LINE (20) + (21) <br />EQUIPMENT 109.05 (b)(4) <br />$0.00 (18) <br />$0.00 (19) <br />$0.00 (20) <br />S0.00 (21) <br />$0.00 (22) <br />Equipment N <br />CONTRACTOR OWNED EQUIPMENT <br />FHWA HOURLY RATE <br />HOURS <br />EXTENSION <br />$0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />$o.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />SO.00 <br />$0.00 <br />S0.00 <br />$0.00 <br />S0.00 <br />$0.00 <br />S0.00 <br />$0.00 <br />S0.00 <br />Trucking - Striaght Time <br />$0.00 <br />S0.00 <br />Trucking -Over Time <br />$0.00 <br />$0.00 <br />Trucking - Double Time <br />$0.00 <br />0. 00 <br />TOTAL EQUIPMENT <br />S0.00 <br />(23) <br />TOTAL TRUCKING <br />$0.00 <br />(24) <br />FUEL, LUBRICANTS AND TRANSPORTATION COSTS <br />$0.00 <br />(25) <br />TOTAL LINES (23) + (24) + (25) <br />$0.00 <br />(26) <br />12 % x LINE (26) <br />S0.00 <br />(27) <br />GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) <br />$0.00 <br />(28) <br />SUBCONTRACTORS 109.05 (b)(6) <br />Removed <br />TOTAL SUBCONTRACT WEEK ENDING <br />7 % x LINE (30) <br />GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) + (32) <br />TOTAL OF WORK COMPLETED FOR THE WEEK <br />$948.95 (29) <br />$66.43 (31) <br />$0.00 (32) <br />$1,015.38 (33) <br />TOTAL LINES (12). (17), (22), (28) 8 (33) $1 ,015.38 (34) <br />1.1 % OF BOND RATE BASED UPON LINE (34) $11.17 (35) <br />10 % x LINE (35) S1.12 (36) <br />TOTAL EXTRA WORK LINES: (34)+ (35)+ (36) $1,027.66 (37) <br />Page 2 of 2 <br />