My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Restoration Design and Assistance with Historic Preservation Grant – K.W. Garner Consulting & Design
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Restoration Design and Assistance with Historic Preservation Grant – K.W. Garner Consulting & Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:29:50 AM
Creation date
9/10/2020 10:15:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SCOPE OF WORK <br />Phase 1 <br />Feasibility Study <br />The feasibility study will document the building for the creation of basic measured drawings, <br />photographic documentation, and identification of areas to be addressed in restoration. The <br />study will provide recommendations for preservation/restoration and programming. This will be <br />in context with the broader site and neighborhood/park area and will incorporate input from <br />key stakeholders and community members. <br />Basic Drawings/Estimates <br />The Consultant will provide basic restoration schematics for use in the grant application and for <br />the development of more refined estimates for construction. This will focus on immediate needs <br />of stabilization/preservation and securing the building. <br />Grant Assistance <br />The Consultant shall provide review and recommendations on the Historic Preservation Fund <br />grant application scheduled for submission in October 2020. It is understood that the feasibility <br />study will be included in the submission and will be referenced in the application to strengthen <br />the overall project's fundability. <br />Phase 2 <br />Principal Investigator <br />The Consultant will fulfill the duties for the Client for these positions as described in the Historic <br />Preservation Fund manual/guidelines. This work will include review of construction drawings for <br />compliance to the Secretary of the Interior's Standards for Rehabilitation of Historic Structures, <br />a requirement of the grant. Submission of these drawings and other pertinent information to <br />the state, and coordinating meetings with the state for project start-up and close-out shall be <br />part of the Consultant's services. The work will require periodic review of restoration work being <br />undertaken at the Shelterhouse, as well as communication and progress reports to the state. <br />The Consultant will work with the Client for payment processing and contract negotiation with <br />the contractor. <br />While the Principal Investigator is not required under grant guidelines to provide construction <br />documents for bidding/procurement purposes, as a Consultant prequalified with the State <br />Historic Preservation Office for the preparation of these drawings and provision of these <br />services, our team is able to complete this if desired, and is identified in the proposal under a <br />separate fee under Phase 2. These drawings would build off of the initial restoration concept <br />drawings being provided in Phase 1 for the feasibility study. <br />
The URL can be used to link to this page
Your browser does not support the video tag.