My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services for the Olive Street Station Roof Repairs – Jones Petrie Rafinski
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services for the Olive Street Station Roof Repairs – Jones Petrie Rafinski
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:21:24 AM
Creation date
7/15/2020 11:32:17 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend <br />May 7, 2020 <br />Page 2 of 4 <br />Construction Administration <br />JPR will conduct periodic reviews (anticipated weekly visits) of construction to ensure the Contractor is <br />providing the level of quality that is required for the project. The construction administration services will <br />include the following: <br />• Coordination and attendance of a pre -construction meeting; <br />• Reviews of site construction will be completed to ensure the Contractor is providing the level of <br />quality that is required for the project; <br />• Based upon the on -site observations and evaluations of the Contractor's Applications for Payment, <br />assistance to the Owner will be provided to determine the amounts due to the Contractor; <br />• JPR will provide clarification/interpretations of the Contract Documents if such interpretations are <br />necessary for the proper execution or progress of work; <br />• JPR shall render written recommendations on claims, disputes and other matters in question <br />between the Owner and Contractor relating to the execution or progress of the project as provided <br />by the Contract Documents; <br />• Review and approve, or take other appropriate action and forward to the Owner for final disposition, <br />the Contractor's submittals such as Shop Drawings, Product Data and Samples with respect to <br />Contract Documents produced by JPR; <br />• Prepare responses to Requests for Information (RFI) provided by the Contractor; <br />• Prepare Change Orders for the Owners' approval and execution; <br />• Provide Field Reports describing observations, problems and recommended solutions; <br />• Provide Punch Lists based on site observations; <br />• Conduct inspections to determine the date or dates of Substantial Completion and the date of Final <br />Completion; <br />• Review and approve, or take other appropriate action on, the Contractor's list of items to be <br />completed or corrected. <br />Schedule <br />The final project schedule will be determined through coordination with the Owner. JPR anticipates the <br />minimum timeframe required to complete the project is 4 weeks assuming all information and the Owner is <br />available to provide input and approvals as required. <br />Project Fees <br />The fee to provide the tasks outlined in the Scope of Services is as follows: <br />Bid/Quote Drawings <br />$4,500.00 <br />Bid/Quote Specifications <br />$4,800.00 <br />Bidding and Negotiation <br />$1,300.00 <br />Construction Administration <br />$3,200.00 <br />Total Fee = <br />$13,800.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.