Laserfiche WebLink
00IE ''oN"ll+ " 3 ...., I fl= ,o a hhi S I i ,o„ e I fine cfl� A,^w'"e Iin Ve <br />Patrick has expended extra effort as follows to -date: <br />■ Additional 4 hours to coordinate Letter of Waiver for CWT with NICTD. <br />■ Additional 12 hours for additional coordination services with NIPSCO and NICTD to coordinate driveway <br />reconfiguration with NIPSCO partners, including phone meetings and conceptual design of the NIPSCO <br />driveway reconfiguration at Grandview Avenue. <br />ryIIalull for <br />Patrick shall lead project efforts by hosting a meeting to discuss the project goals, preliminary challenges, schedule, <br />as well as begin the field survey process. <br />Patrick shall coordinate and participate in teleconferences and online meetings (as required) during the project. <br />Patrick shall attend the following project meetings in person: <br />■ One (1) Initial Project meeting at City Hall (or location of your choosing). <br />■ One (1) In -Person Coordination/Review Meeting with the City <br />Patrick shall prepare and submit meeting minutes for the following meeting: <br />■ Initial Project meeting <br />■ In -Person Coordination/Review Meeting with the City <br />It is not anticipated that Patrick personnel will need to enter railroad right-of-way (R/W) for this scope of work. <br />Patrick shall be responsible to ensuring that all staff who enter onto railroad R/W have obtained the required safety <br />briefing from the appropriate railroad supervisor or flagman. Patrick staff that enters onto railroad R/W shall be <br />eRailsafe certified and have current roadway worker protection training. Patrick shall notify the appropriate railroad <br />before entering railroad R/W. <br />11 V ���'. Il l+ ' sry'��:d V�� �V� d, „"'IIV P I yy II for V „k,.l I IIV ,Vrc:d Scope <br />p'e <br />Task 1: Topographical Field Survey <br />The scope shall include the minimum survey required to assemble final design plans for bidding. We have anticipated <br />that the Ford Street survey work may be completed outside of the gate limits and therefore the costs for CN Right - <br />of -Entry (ROE) and flagging have been excluded. <br />Task 2: Detailed Design of Safety Improvement easures <br />This task shall be to provide full design services to construct improvements as defined as non -traversable curb <br />medians necessary to keep the Quiet Zone Risk Index (QZRI) equal to or below the National Significant Risk Threshold <br />(NSRT) or Risk Index With Horns (RIWH) which will qualify as Supplemental Safety Measures (SSMs) or Alternative <br />Safety Measures (ASMs) at the aforementioned public at -grade crossings. Modifications will also be required at the <br />NIPSCO driveway at the northeast quadrant of the NICTD Grandview Avenue crossing, and will be included in the <br />design work. <br />Task a Develop BidDocuments <br />It is assumed that one construction package will be prepared for all work. INDOT standards will be used for any <br />required traffic control. The plan and profile sheets will also include drainage, grading, and basic restorative <br />landscaping if needed. Special Provisions will be prepared and will include City and INDOT items. The associated <br />I I fls IFMPO 111 ,: A"VdI1I lU 11 FI )NM IlR'11 i1I`IIM::'.0 III II IIII;III II1V 11I1!D A"I I AIl`I':P Vlll ll`II,I �; All IN M II IIL.. V11`, 11VIN 10 UID, <br />flu I, �AIAIIll I W 11%, 1 1 Y S IIIOI1%/F IIII tllNA A IIA"I 1V I�1I1ud: uu W AAII ilkIU IAI 11b: f�)I uIdlH T( Ad IW)llkIY III I�)Y IM I: ha it l II iI IIII <br />"lIII9)7I1 I I I I 11I M Ss INMII1r'a kV, I III it I � A I I M K I:::Il II IA II � I M iI u1v;.,, <br />11111611111111111111111 <br />ENGINEERING <br />