My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Roof Crush: This same test cab was then subjected to a roof <br />crush force of 24.453 lbs. This value meets the ECE 29 criteria, <br />which must be equivalent to the front axle rating up to a maximum <br />of 10 metric tons. <br />Pass -Fail criteria of the SAE tests and the ECE 29 test is a measure of whether the "survival <br />space" inside the cab is compromised, all doors remain shut, and the cab remained attached <br />to the chassis frame in at least one location. The Pierce cab met all of the Performance <br />Criteria requirements on all 3 integrity tests. <br />Witnessed and Certified by: <br />Pierce Manufacturing, Inc. <br />David Archer <br />Vice President of Engineering <br />CD0130 Cab Integrity Certification - Saber FR - Enforcer .doc 2 11/17/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.