My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PIERCE MANUFACTURING INC.° <br />AN OSHKOSH TRUCK CORPORATION® COMPANY <br />Certification Document CDO130 <br />Saber° FR - Enforcer TM <br />Cab Integrity Certification <br />Pierce Manufacturing certifies the integrity of the Saber° FR — EnforcerTM cab relative to <br />occupant protection. <br />A specimen representing the substantial structural configuration of the Saber° FR — EnforcerTM <br />cab models has been successfully tested in accordance with the following standards. <br />• SAE J2422 Cab Roof Strength Evaluation — Quasi -Static Loading Heavy Trucks. <br />• European Occupant Protection Standard ECE Regulation No. 29. <br />• SAE J2420 COE Frontal Strength Evaluation — Dynamic Loading Heavy Trucks. <br />Side Impact: The test cab was subjected to dynamic preload <br />where a 14,253 lb moving barrier was slammed into the side of <br />the cab at 5.25 mph, striking with an impact of 13,000 ft-Ibs of <br />energy. This test is not required to meet the ECE 29 standard, <br />but is part of the SAE J2422 test procedure and more closely <br />represents the forces a cab will see in a roll-over incident. <br />Frontal Impact: The test cab was struck by the 14,253 lb moving <br />barrier at a speed sufficient to impart the required 32,549 ft-Ibs of <br />energy. <br />CD0130 Cab Integrity Certification - Saber FR - Enforcer .doc 1 11/17/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.