My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Oshkosh Corporation Classification: Unrestricted <br />PIERCE MANUFACTURING INC.° <br />ANOSHKOSH CORPORATION®COMPANY <br />Certification Document CDO137 <br />SabeeFR - Enforcer TM <br />Cab Doors <br />Pierce Manufacturing certifies the integrity of the Saber° FR — EnforcerTM cab doors. <br />Specimens representing the substantial structural configuration of the Saber° FR — EnforcerTM <br />cab front and crew doors have been successfully tested to meet the following objectives: <br />OBJECTIVES: <br />• Survive a 200,000-cycle door slam test with a slam acceleration up to 20 g's on one <br />representative <br />• Validate the assembly concept of the main structure of the door by evaluating the <br />durability of the bonding technique. <br />• Evaluate components, structure, and mounting of the door during and the end of the <br />test for fatigue and failure to ensure durability. <br />• Verify that the door seals function properly at the end of the test. <br />• Evaluate the new extrusions and castings of the cab doorframe during and at the end of <br />the test for fatigue, failure, and deformation of seal flanges. <br />• Evaluate various mounting options for the electronic control module for durability during <br />portions of the slam test. <br />CONCLUSIONS: <br />• The door structure and doorframe successfully completed a 200,000-cycle door slam <br />test with a door slam acceleration of 20 g's. <br />VALIDATION TEST: RD2425 <br />Pierce Manufacturing, Inc. <br />David Archer <br />November 18, 2014 <br />CDO137 Door Durability -Saber FR -Enforcer 141118.doc 1 11/18/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.