My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DISCHARGE OUTLET (REAR) <br />A 3.00" discharge outlet will be located at the rear of the hose bed, below the pump access door. The <br />discharge outlet will be plumbed with 3.00" pipe and gated with an Akron 3.00" valve controlled at the <br />pump operator's panel by means of a handwheel. <br />An indicator will be provided to show when the valve is in the closed position. <br />OUTLET BLEEDER VALVE <br />A 0.75" bleeder valve will be provided for each outlet 1.50" or larger. Automatic drain valves are <br />acceptable with some outlets if deemed appropriate with the application. <br />The valves will be located behind the panel with a swing style handle control extended to the outside of <br />the side pump panel. The handles will be chrome plated and provide a visual indication of valve <br />position. The swing handle will provide an ergonomic position for operating the valve without twisting <br />the wrist and provides excellent leverage. Bleeders will be located at the bottom of the pump panel. <br />They will be properly labeled identifying the discharge they are plumbed in to. The water discharged by <br />the bleeders will be routed below the chassis frame rails. <br />REAR OUTLET ELBOWS <br />The 2.50" discharge outlets, located at the rear of the apparatus, will be furnished with a 2.50" (F) <br />National Standard hose thread x 2.50" (M) National Standard hose thread, chrome plated, 30 degree <br />elbow. <br />The elbow will be Pierce VLH, which incorporates an exclusive thread design to automatically relieve <br />stored pressure in the line when disconnected. <br />ADDITIONAL REAR OUTLET ELBOWS <br />The 4.00" discharge outlets, located at the rear of the apparatus, will be furnished with a 4.00" (F) <br />National Standard hose thread x 4.00" Storz elbow/adapter with a Storz cap. <br />LARGE DIAMETER OUTLET ELBOWS <br />The 4.00" outlet will be furnished with a 4.00" (F) National Standard hose thread x 5.00" Storz elbow. <br />A 5.00" Storz x 2.5" (M)NST rigid adapter with cap and chain will be provided with the elbow. <br />ADAPTER <br />There will be three (3) adapters with 1.50" FNST X IPT. These adapters will be installed on both <br />crosslay and front bumper discharge. <br />ADAPTER <br />There will be six (6) adapters with 2.50" Female NST x 2.50" Male FNST installed all 2.50 discharges. <br />DISCHARGE OUTLET CONTROLS <br />The discharge outlets will incorporate a quarter -turn ball valve with the control located at the pump <br />operator's panel. The valve operating mechanism will indicate the position of the valve. <br />If a handwheel control valve is used, the control will be a minimum of a 3.9" diameter stainless steel <br />handwheel with a dial position indicator built in to the center of the handwheel. <br />69 of 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.