My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Two (2) indicator lights will be provided adjacent to the pump shift inside the cab. One (1) green light <br />will indicate the pump shift has been completed and be labeled "pump engaged". The second green <br />light will indicate when the pump has been engaged, and that the chassis transmission is in pump gear. <br />This indicator light will be labeled "OK to pump". <br />The pump shift will be interlocked to prevent the pump from being shifted out of gear when the chassis <br />transmission is in gear to meet NFPA requirements. <br />The pump shift control in the cab will be illuminated to meet NFPA requirements. <br />TRANSMISSION LOCK -UP <br />The direct gear transmission lock -up for the fire pump operation will engage automatically when the <br />pump shift control in the cab is activated. <br />AUXILIARY COOLING SYSTEM <br />A supplementary heat exchange cooling system will be provided to allow the use of water from the <br />discharge side of the pump for cooling the engine water. The heat exchanger will be cylindrical type <br />and will be a separate unit. The heat exchanger will be installed in the pump or engine compartment <br />with the control located on the pump operator's control panel. Exchanger will be plumbed to the master <br />drain valve. <br />INTAKE RELIEF VALVE - PUMP <br />An Akron Style 53 relief valve will be installed on the suction side of the pump preset at 125 psig. <br />The relief valve will have a working range of 50 psi to 250 psi. <br />The outlet will terminate below the frame rails with a 2.50" National Standard hose thread adapter and <br />will have a "do not cap" warning tag. <br />The relief valve pressure control will be located behind behind the right side pump panel with a <br />stainless steel access door. <br />PRESSURE CONTROLLER <br />A Pierce Pump Boss Model PBA300 pressure governor will be provided. <br />A pressure transducer will be installed in the water discharge manifold on the pump. <br />The display panel will be located at the pump operator's panel. <br />PRIMING PUMP <br />The priming pump will be a Trident Emergency Products compressed air powered, high efficiency, <br />multistage venturi based AirPrime System, conforming to standards outlined in the current edition of <br />NFPA 1901. <br />All wetted metallic parts of the priming system are to be of brass and stainless steel construction. <br />One (1) priming control will open the priming valve and start the pump primer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.