Laserfiche WebLink
Wood storm windows and doors painted or finished to match the original should be used but <br />should not damage existing frames. If new sashes or doors are installed, the existing or original <br />materials, design and hardware should be used. When metal storm doors are used, they should be <br />painted, anodized or coated to match the existing. When awnings are used, they should be of canvas material. <br />Prohibited <br />Original doors, windows and hardware shall not be discarded when they can be restored and reused in place. New window and <br />door openings, which would alter the scale and proportion <br />of the building may not be introduced. Inappropriate new window and door features such as metal, vinyl or fiberglass awnings, <br />hoods or aluminum insulating glass combinations <br />that require removal of original windows and doors, shall not be installed. <br />Not Recommended <br />Fake shutters that would detract from the existing character or appearance of the building should not be used. <br />STAFF RECOMMENDATION: Staff recommends approval of the project as it conforms to the standards and guidelines for <br />Chapin Park. <br />C.D. Hostetler, <br />Director <br />On a motion by Brandon Anderson with a second by Kevin Buccellato to amend application to <br />substitute wood, not clad Semco window with 1 ''/z" muntin. <br />Vote: 4 — 0 unanimous. <br />COA#2015-0203 Amended. <br />On a motion by Kevin Buccellato with a second by Tom Gordon to approve application as <br />amended. <br />Vote: 4 — 0 unanimous. <br />COA#2015-0203 Approved. <br />B. NATIONAL REGISTER NOMINATION — None. <br />III. HEARING OF VISITORS — Jennifer Parker. <br />IV. REGULAR BUSINESS <br />A. APPROVAL OF MINUTES —January 26, 2015 approved by general consent. <br />B. TREASURER'S REPORT <br />1. Location Report — Distributed. <br />C. STAFF REPORTS <br />1. Correspondence —Circulated. <br />2. Routine Maintenance Exclusion Approvals --Circulated. <br />3. Director's Report —Distributed. <br />4. Assistant Director Report —Distributed. <br />5. Preservation Specialist Report —Enforcement discussion. <br />6. Legal Counsel None. <br />D. COMMITTEE REPORTS <br />1. Presidents Report None. <br />V. OLD BUSINESS <br />VI. NEW BUSINESS <br />A. Marquette School <br />B. Country Bake Shop <br />C. Tool Crib <br />VII. ADJOURNMENT <br />2 <br />