My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September 2010
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2010
>
September 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:18 PM
Creation date
6/8/2020 10:14:48 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1-li-0 0-0,1-0-0 <br />Sx10M71Uk= <br />7-0-0 <br />REACTIONS (Ib/size) 2-645/0 3 B, 4-645i0 3 8 <br />MaxI lorz2-31(LC !) <br />Max llplift2- 9n(I C 9). 4- 9)(1 C 10) <br />Mdx Grav2_6,19(LC 2). 4-v-19(LC 2) <br />FORCES (lb) fvlaxin-mm I ensinn <br />IUP( IIORD i ' U;'1tS.G :' 1�iytS3U�, i -I -t )�b.31�,:i-U ib :.it:�,'i• 1 E'c4 :� u. 1-:� G ti3 <br />I'•O I (:I IO1i11 ? (i- ?4?'l SE'i(>. 1 ii= ?4?.'l3�GG <br />WEB, 343--2i7r_s9 <br />NOTES <br />1) l ribalanred roof live Triads have keen cnnsidered for this desigJn <br />2) Wind- ASCE 7.05; 90mph; h=25tt; I CUL =4 2pst; BGIA-=6 Opst; C=ategory II; Exp B; enc=losed; MWI-R5 (lour -rise) gable end <br />zone aryl C -C Exterior(2) zone, cantilever left and right exposed , erxi vertical left ar-rJ right exposed, Lumber DOL=0.00 <br />[date grip DOL=O 00 Plate metal D01.=0 00. This truss is designed for G G for members and forces, alai for MW FRS for <br />reactions specified. <br />3) TOLL: ASCE 7-05, Pi25.0 psf (roof live load: Lumber DOL -0.00 Plate DOL -0.00 Plate metal DOL -0.00), r'y-3b.? psf <br />(ground snow); I's -24.7 pst (root snow: Lumber DOL -0.00 I'late DOL -0.00 Plate metal DOL -0.00); Category 11: Exp B; <br />Fully Exp., Ct-1 .1 <br />4) Hoot design snow load has been reduced to acx:ourlt for slope <br />5) Unbalanced snow loads have been considered for this design. <br />6) This truss has been designed for greater of rain roof live load of 16.0 psf or 1.00 times flat roof load of 24.11 psf Uri <br />overhangs non -concurrent with other live loads. <br />CP1r�hincttWr�rAfr><xortietin desiuned for a 10.0 Usf bottom chord live load nonconcuffent with anv other live loads. <br />:1 <br />4 no 12 <br />- --- - - <br />3 -_ <br />7 <br />I <br />- <br />- -:. <br />,- <br />14-0-0 <br />'-0-0 <br />7-O-0 <br />LOADING (psf) <br />SPACING <br />2-0.0 <br />CSI <br />DEFL in <br />(roc) Udefl Lid <br />PLATES GRIP <br />ICL l_ tri 0 <br />Plates Increase <br />1 00 <br />1 (; O 58 <br />Vert(11) O 15 <br />h x-999 240 <br />MI ?O 197/144 <br />TCDL 7.0 <br />LUrnbel Increase <br />1.00 <br />BC 0.59 <br />VerL(TL) -0.32 <br />2-6 X515 180 <br />PAT 18H 197/1'1'1 <br />13CLL 0.0 <br />Rep Stress In(;r <br />YES <br />WD O.bb <br />I loiz(TL) 0.1 b <br />i n/a n/a <br />ti(:DL 10.0 <br />Code II IC2003/ 11'12002 <br />(Matrix) <br />Weight: 36 lb <br />LUMBER <br />BRACING <br />TO 2 X 4 SPF No.2 <br />TOP CHORD <br />Struclurdl wood sheathing directly applied or 3-5-•1 UC purlins. <br />13C 2 X 4 SPF 1 boUL- <br />1.oE <br />DOT CHORD <br />Rigid ceiling directly applied or <br />1 U -U -U oc bracing. <br />WB 2 X 3 SPF Stud <br />REACTIONS (Ib/size) 2-645/0 3 B, 4-645i0 3 8 <br />MaxI lorz2-31(LC !) <br />Max llplift2- 9n(I C 9). 4- 9)(1 C 10) <br />Mdx Grav2_6,19(LC 2). 4-v-19(LC 2) <br />FORCES (lb) fvlaxin-mm I ensinn <br />IUP( IIORD i ' U;'1tS.G :' 1�iytS3U�, i -I -t )�b.31�,:i-U ib :.it:�,'i• 1 E'c4 :� u. 1-:� G ti3 <br />I'•O I (:I IO1i11 ? (i- ?4?'l SE'i(>. 1 ii= ?4?.'l3�GG <br />WEB, 343--2i7r_s9 <br />NOTES <br />1) l ribalanred roof live Triads have keen cnnsidered for this desigJn <br />2) Wind- ASCE 7.05; 90mph; h=25tt; I CUL =4 2pst; BGIA-=6 Opst; C=ategory II; Exp B; enc=losed; MWI-R5 (lour -rise) gable end <br />zone aryl C -C Exterior(2) zone, cantilever left and right exposed , erxi vertical left ar-rJ right exposed, Lumber DOL=0.00 <br />[date grip DOL=O 00 Plate metal D01.=0 00. This truss is designed for G G for members and forces, alai for MW FRS for <br />reactions specified. <br />3) TOLL: ASCE 7-05, Pi25.0 psf (roof live load: Lumber DOL -0.00 Plate DOL -0.00 Plate metal DOL -0.00), r'y-3b.? psf <br />(ground snow); I's -24.7 pst (root snow: Lumber DOL -0.00 I'late DOL -0.00 Plate metal DOL -0.00); Category 11: Exp B; <br />Fully Exp., Ct-1 .1 <br />4) Hoot design snow load has been reduced to acx:ourlt for slope <br />5) Unbalanced snow loads have been considered for this design. <br />6) This truss has been designed for greater of rain roof live load of 16.0 psf or 1.00 times flat roof load of 24.11 psf Uri <br />overhangs non -concurrent with other live loads. <br />CP1r�hincttWr�rAfr><xortietin desiuned for a 10.0 Usf bottom chord live load nonconcuffent with anv other live loads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.