My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September 2010
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2010
>
September 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:18 PM
Creation date
6/8/2020 10:14:48 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Design # 11500 <br />Here are the wall configurations for your design. <br />Illustration May Not Depict All Options Selected <br />3 0 A <br />Gable Front View <br />(1) - 8X7 WHITE NONINSL RAISED PNL EXTSIP MSST <br />0-U 0 A0•0 <br />Eave Front View <br />(1) - CP1 FLUSH STEEL DOOR PH 36X80 RH SB <br />Building Size: 14 feet wide X 18 feet long X 8 feet high <br />--cimate Peak Height: 10 feet 8 inches (128 inches) <br />U -U ' <br />Pace 2 of 2 <br />9 812010 <br />Gable Back View <br />. <br />EaaaJ.a;:aaaatial#;i8;:;�;;;i,i:2;:2;2:•:�;t{iti#...,,;rzt„„.2;ta:;:�;u;;:<;2' iz3;a xa:aa <br />titi;;ti.;ai'�Zz�i �atia;:>:;?;•>,> <br />Eave Back View <br />18, ... ... - - <br />Menards provided material estimates are intended as a general construction aid and have been calculated using typical construction methods. Because of the wide variable in cc-- <br />site restrictions, all final plans and material lists must be verified with your local zoning office, architect and/or builder for building design and code compliance. Menards is a sup;}_ <br />construction materials and does not assume liability for design, engineering or the completeness of any material lists provided. Underground electrical, phone and gas lines shot I <br />located and marked before your building plans are finalized. Remember to use safety equipment including dust masks and sight and hearing protection during consiruction'o e.. <br />a positive building experience. <br />
The URL can be used to link to this page
Your browser does not support the video tag.