Laserfiche WebLink
that we do have and are within the building. All exterior doors will be <br />repaired and refinished. We will not be installing any new exterior entry <br />doors. See attachment/label #9. <br />10.) All exterior walls with stucco will be repaired with like materials and <br />the exterior columns will be repaired and maintained. All exterior painting <br />will be scraped and cleaned prior to a new coat of primer and paint being <br />installed. The new color of the building will match closely with that of the <br />existing. Please see the attached rendering for color. See attachment/label <br />#10. <br />11.) If we are able to remove the staining that is a result of the gutter /water <br />floor out of the gutters we will plan to have that maintained as well. We <br />plan to paint in copper paint any galvanized ridge cap, valley, flashing. See <br />attachment/label / and spec #1. <br />