My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
June 1996
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1996
>
June 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:24 PM
Creation date
6/8/2020 10:08:35 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001403
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br />0 <br />IL r_ <br />-7, I -EFT CF FLE�IC P. <br />1400 - STREET EXCAVATION REPAIR <br />The following Section shall be added: <br />1400.01 - AUTHORITY: Chapter 35, Article I-1, Division 2 <br />Municipal code, City of South Bend, indiana <br />1400-02 - DESCRIPTIONS <br />Whereas: The Board of Public Works deems it necessary to <br />establish a firm policy for the backfilling of ez--avations and replacemen <br />of pavement disturbed as a result of making an opening or excavation in <br />any street, these specifications are set forth and the compliance <br />therewith shall be a requirement of obtaining a permit for said opening 9 <br />excavation under Chapter 35, Article 11, Division 2,, Excavations, as set <br />forth in the South Bend Municipal Code. Xt shall be the obligation of an <br />person, firm or corporation obtaining a permit for an opening or <br />excavation in the public right -o£ -way to backfill the excavation and <br />replace the pavement as set forth in these 'specif i cations: <br />BackfIll. - All excavations under pavement shall be backfilled with <br />reasonably clean granular material w -it -h good compaction qualities. The <br />material shall be placed in layers not to exceed 6 inches in depth. Eac <br />layer shall be thoroughly tamped with a vibratory type mechanical tamper <br />Special care shall be taken in filling around sewers, water pipes, gas <br />lines, etc., to keep the earth at the same height on both sides to avoid <br />shifting the pipe line. No removed paving materials or debris shall be <br />used in backfilling the excavation. Excavations not under a pavement riz I <br />be backfilled with virgin material removed from the excavation. <br />Pavement Replacement - All pavement shall be replaced with a type i, <br />construction equal to or better than that which is removed,' as approvecl, <br />writting by the City Engineer. All concrete pavement removal shall be <br />the nearest joint. Joints in concrete replacement pavement shall match <br />the existing joints in the pavement - <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.