My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
October 1994
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1994
>
October 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:23 PM
Creation date
6/8/2020 10:08:16 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001403
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DHPA Grant Cycle 1995 <br />9-28-94 <br />PROPOSAL SUMMARY <br />Project: Riverside Drive Bank Stabilization Feasibility Study <br />DHPA Priority Area: Architectural/Historical <br />Project Description: <br />Provide landscape architectural and engineering services to determine the <br />cause of and generic remedies (or mediation techniques) for bank slump which <br />threatens structures in the Chapin Park National Register Historic District <br />and Riverside Drive Local Historic District. <br />The anticipated work product would be a manual which is understandable to a <br />lay -person (property owner) which gives direction to activities (which are <br />otherwise environmentally acceptable) which will act to conserve the riverbank <br />and resident structures. <br />Comments: <br />This project is a response to encroaching environmental conditions which <br />threaten designated historic structures. Many of these structures have at one <br />time had passive recreation facilities down the bank (stairs, terraces, etc.) <br />of which traces remain. There are many active springs on the bank. <br />The condition may be characterized by a high bluff with structures built close <br />to its edge. This location is on the outside bank of a curve in the St. Joseph <br />River. Apparently the washing away of soil at the river water level results in <br />corresponding slump at the top of a moderately steep hillside, which has now <br />come dangerously close to existing structures, undermining existing <br />foundations, etc. <br />Piecemeal approaches by property owners have had various positive and negative <br />effects. A comprehensive plan is required to inform property owners of <br />appropriate and inappropriate responses to the bank conservation problem. <br />Other related issues which will require consideration are restrictions and <br />necessary procedures related to potential effects on the river wildlife, flow, <br />and other concerns of the Army Corps of Engineers, Indiana Department of <br />Natural Resources, etc. <br />David B. Duvall, Director - Historic Preservation Commission page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.