My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 1993
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1993
>
November 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 5:12:34 PM
Creation date
6/8/2020 10:08:02 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Heritage Foundation <br />. November 4, 1993 <br />Page 2 <br />• <br />6. Fabricate and install new gutter liner from 16 ounce lead <br />coated copper. Profile to match existing. NOTE - All <br />repair work of the gutter superstructure that is required to <br />be by others. <br />7. Fabricate and install new valleys, hip and ridge trim <br />pieces, wall flashings, chimney flashings from 16 ounce lead <br />coated copper. Valley metal to have a 1" high water <br />diverter/expansion joint in the center. <br />8. Supply and install Certainteed's Grand Manor shingles. <br />Provide the owner with the manufacturer's 40 year warranty. <br />Color to be selected by the owner. <br />9. Supply and install new corrugated 16 ounce lead coated <br />copper downspouts and elbows. <br />10. Clean area of all associated debris and remove from site. <br />Contract Price: <br />SIXTY TWO THOUSAND, FOUR HUNDRED AND EIGHTY FIVE <br />DOLLARS ($62,485.00) <br />If you have any questions and/or comments, please feel free to <br />contact the writer. <br />Sincerely, <br />MIDLAND ENGINEERING COMPANY <br />Steven Kurtz <br />Manager <br />Slate, Tile, Masonry Restoration <br />and Waterproofing Division <br />SK/cam <br />TERMS AND CONDITIONS: If the work is completed within 30 days of Its commencement, payment in full is due upon receipt of invoice. In all other cash, payment <br />of 95 % of the work completed shall be due upon receipt of invoice covering partial billing with final payment due upon receipt of invoice covering final billing. Non- <br />payment in accordance with the above shall be cause for terminating performance. If payments are not made when due, interest, costs incidental to Collection and at- <br />torney'sfees shall be added to the unpaid balance. Interest shall accrue at the rate of 1 Y, % per month. Customer waives application of valuation and appraisement <br />laws. Not liable for fa ilura to perform caused by strikes, fire or anything beyond our control. Quotations subject to change without notice. Estimates limited to 15 days acceptance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.