My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 1993
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1993
>
November 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 5:12:34 PM
Creation date
6/8/2020 10:08:02 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SINCE 1922 <br />MMLMMLA <br />ry� <br />1� <br />i)7mRnD ��.M01=�' <br />EnGmmm � • <br />Midland Engineering Company • 52369 U.S. 33 North South Bend, Indiana 46637 <br />P.O. Box 1019 • South Bend, Indiana 46624 <br />Telephone (219) 272-0200 . FAX Number (219) 272-7400 <br />November 4, 1993 <br />South Bend Heritage Foundation <br />914 Lincoln Way West <br />South Bend, IN 46616 <br />IF, <br />Attention: Mr. Paul Hayden <br />W Reference: Reroof Old Fire Station <br />Notre Dame Avenue <br />O South Bend, IN <br />LE Gentlemen: <br />In accordance with your request we propose to furnish labor, <br />O material, equipment, insurance, etc. to perform the following <br />work. <br />1. Provide and erect proper scaffolding to insure a safe and <br />efficient roofing operation. <br />2. Tear off existing slate roofing and underlayment down to the <br />wood deck. <br />3. Inspect the deck for deterioration. Any deck requiring <br />replacement to be handled on a time and material add to the <br />contract. <br />4. Supply and install a 3' wide strip of W. R. Grace "Ice and <br />Water Shield" at all eaves, hips, valleys, walls, etc. <br />5. Supply and install 30 pound felt dry sheet over the entire <br />roof area. <br />• ROOFING / SHEET METAL / MASONRY RESTORATION / WATERPROOFING <br />MEMBERS: NATIONAL ROOFING CONTRACTORS ASSOCIATION I URETHANE FOAM CONTRACTORS ASSOCIATION <br />SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION <br />TERMS AND CONDITIONS: If the work is completed within 30 days of its commencement, payment in full is due upon receipt of invoice. in all other uses, payment <br />o1 95 % of the work completed shall be due upon receipt of invoice covering partial billing with final payment due upon receipt of invoice covering final billing. Non- <br />payment ifaccordance with the above shall be cause for terminating performance. If payments are not made when due, interest, costs incidental to collection and at- <br />torney's fees shall be added to the unpaid balance. Interest shall accrue at the rate of I V, % per month. Customer waives application of valuation and appraisement <br />laws. Not liable for failure to perform caused by strikes, fire or anything t.eyond our control. Quotations subject to change --bout notice. Estimates limited to 16 days acceptance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.