My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 1993
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1993
>
November 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 5:12:34 PM
Creation date
6/8/2020 10:08:02 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSAL <br />H.G. ROOFING & CONSULTING, INC. <br />• P.O. BOX 406 23122 S.R. 4 LAKEVILLE, IN 46536 TELEPHONE 219-784-2006 <br />1:abricate and install all required valley flashing. It will have a 24" stretch out made <br />from 16 ounce copper. The valley will be fastened with copper cleats to accommodate <br />for expansion and contraction. <br />8. Fabricate and install all required hip and ridge (lashing made from 16 ounce copper. All <br />will be fastened with stainless steel screws. <br />9. Supply and install all required four inch round corrugated down spouts made from 16 <br />ounce lead coated copper. <br />10. Properly flash one chimney using 3# sheet lead and copper counter flashing. <br />11. Supply and install new grey/black Vermont slate, standard thickness, 18" by random. <br />• All slate will be fastened with two 1'/2 copper nails. <br />12. The top metal roof will be cleaned, primed and coated with Top Coat metal roof <br />coating. <br />All required Brood work at eave gutter/soffit sections will be carried out on a time and <br />material basis and will be billed as extra. <br />• SPECIALIZING IN SLATE AND TILE ROOFING <br />RESTORATION NEW APPLICATION <br />MEMBERS: NATIONAL ROOFING CONTRACTORS ASSOCIATION / ROOF CONSULTANTS INSTITUTE <br />TERMS AND CONDITIONS: 11 the work Is completed within 30 days of itscommencement. payment Is lull Is due upon receipt o1 Invoice . In all other cases, payment of 95% of the work completed shall be <br />due upon reclept of Invoice covering partial billing with final payment due upon redept of Invoice covering final billing. Non-payment In accordance with the above shall be cause for terminating performance. <br />11 payments are not made when due, interest, costs incidental to collection and attorney's lees shall be added to the unpaid balance. Interest shall accrue at the rate of 1 12% per month. Customer waives <br />application of valuation and appralsemtent laws. Not liable for failure to perform caused by strikes, Ike or anything beyond our control. Quotations subject to change without notice. Estimates Ilnited to 15 days <br />acceptance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.