My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 1993
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1993
>
November 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 5:12:34 PM
Creation date
6/8/2020 10:08:02 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSAL <br />H.G. ROOFING & CONSULTING, INC. <br />• P.O. BOX 406 23122 S.R. 4 LAKEVILLE, IN 46536 TELEPHONE 219-784-2006 <br />November 4, 1993 <br />Neighborhood blousing Services <br />803 N. Notre Dame Ave. <br />South Bend, IN 46617 <br />Att: Ms. Anne R. Bockenkamp - Exec. Dir. <br />RE: Complete slate re-rool'at the old fire station at the above address. <br />Dear Ms. Bockenkamp, <br />In reference to your request and site inspection by the writer, our proposal is as follows: <br />We have identified and separated five different sections of the roof to allow for easier <br />selection. <br />All specifications will be identical for each of the five sections. <br />• 1. Supply and install all required scaffolding and rigging to insure a safe working <br />condition. <br />2. Remove all existing slate down to the bare wood deck and cart debris from the job site. <br />3. Replace any deteriorated wood decking on a time and material basis. <br />4. Supply and install Ice & Water Shield three feet wide on all eaves and valley sections. <br />S. Supply and install one layer of Tamco SS# underlayment fastened with one inch <br />Simplex nails. This will serve as the underlayment and temporary protection during <br />the. re -roof operation. <br />6. Fabricate and install all required gutter liner made from 16 ounce copper matching the <br />existing profile. <br />• SPECIALIZING IN SLATE AND TILE ROOFING <br />RESTORATION NEW APPLICATION <br />MEMBERS: NATIONAL ROOFING CONTRACTORS ASSOCIATION / ROOF CONSULTANTS INSTITUTE <br />TERMS AND CONDITIONS: If the work Is completed whhln 30 days of Itscommencement. payment Is full Is due upon receipt of Invoice . In all other cases, payment of 95% of the work completed shall be <br />due upon reciept of Invoice covering partial billing with final payment due upon reciept of Invoice covering final billing. Non-payment In accordance with the above shall be cause for terminating performance. <br />If payments are not made when due, Interest, costs Incidental to collection and attorney's fees shall be added to the unpald balance. Interest shall accrue at the rate of 112% per month. Customer waives <br />application of valuallon and appralsement laws. Not liable for failure to perform caused by strikes, fire or anything beyond our control. Quotations subject to change without notleo. Estimates limited to 15 days <br />acceptance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.