Laserfiche WebLink
Zach Hurst, PE <br />US 20/31 Bridge Aesthetics <br />Page 2 <br />anticipated to be 8 weeks after direction is received regarding which aesthetic option to <br />develop. <br />Preparation of Stage 3 plans and special provisions addressing comments from Stage 1 plan <br />review. These plans will be included with the INDOT contract submittal. This will follow the <br />INDOT schedule currently targeted for December 18, 2020. <br />Staff ­11oul . . . . . <br />Our design engineering services will consist of: <br />Part A <br />Work Task Staff IHours <br />Prepare IExhi bits/ Renderings 21 <br />Cost (Estimates 3 <br />Video Conference Discussion 2 <br />Total Staiff IHours: <br />EN IIIhIIEERIIN IFIEE <br />Our engineering fee will be as follows: <br />Labor: <br />26 Staff Hours x $48.50 per hour x 2.9 <br />In -House Direct Costs: <br />Travel <br />Part IB <br />Work Task <br />Prepare Stage 1 and Stage 3 plans <br />Prepare Stage 3 special provisions <br />Total Staiff IHours: <br />EN IIIhIIEERIIN IFIEE <br />Our engineering fee will be as follows: <br />Labor: <br />60 Staff Hours x $48.50 per hour x 2.9 <br />In -House Direct Costs: <br />Travel <br />W <br />$ 3,656 <br />$ 0 <br />Total IEngineering IFee $ 3,656 <br />Staff IHours <br />48 <br />12 <br />N <br />$ 8,439 <br />$ 0 <br />Total IEngineering IFee $ 8,439 <br />L <br />