My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA – Re-Submittal of Permits, Utility Coordination, Appraisals, and Easement Acquisition Services for Prairie Ave. Water Main Loop - HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to PSA – Re-Submittal of Permits, Utility Coordination, Appraisals, and Easement Acquisition Services for Prairie Ave. Water Main Loop - HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:40:21 AM
Creation date
2/26/2020 11:08:12 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
crossing of US-31. It also includes a creek crossing along SR-23 and <br />pavement replacement of SR-23 as required for the installation of the water <br />main. Connection to an existing water main along SR-23 and at the Four <br />Winds Casino is also included. See Attachment 1 for a layout of the <br />proposed water main improvements. <br />This Amendment No. 2 consists of reviewing & updating the final design with <br />any changes or revisions as required and revising & resubmitting permits <br />that have expired due to project delays related to financing and easement <br />acquisition. This amendment also includes additional land acquisition <br />services including updated easement descriptions, appraisals and <br />buying/management. The detailed scope of services for Amendment No. 2 is <br />included in Attachment 2. <br />The responsibilities of Owner are modified as follows: <br />There are no modifications to the responsibilities of the Owner as set forth in <br />the Original Agreement. <br />d. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />Following are the proposed fees for this Amendment for completing the <br />scope of services included in Attachment 2. Compensation for the Final <br />Design Phase shall be paid in accordance with Exhibit C, Article C2.01. <br />Compensation for the Additional Services shall be paid in accordance with <br />Exhibit C, Article C2.02. <br />Final Design Phase (Lump Sum) $8,900 <br />Additional Services (Hourl NTE) $23,495 <br />Amendment No. 2 Total: $32,395 <br />The schedule for rendering services is modified as follows: <br />The period of service indicated in Exhibit C, Article C2.01.11 of the original <br />agreement shall be modified to a period not exceeding 24 months from <br />authorization to proceed with final design. The updated schedule anticipated <br />for the phases identified in Exhibit A, Part 1— Basic Services and Part 2 — <br />Additional Services is provided below. <br />Preliminary Design Phase: Complete <br />Final Design Phase: 180 days following Amend. #2 Approval <br />Bidding Phase: 60 days Following Authorization to bid <br />Construction Eng. Phase: Thrill Duration of Construction <br />Additional Services: 180 days following Amend. #2 Approval <br />Page2 <br />(Exhibit K — (Amendment No. Two to Owner -Engineer Agreement)- Attachment 1) <br />EJCDC E-500 Agreement Between Owner and EnIber for Professional Services. <br />Copyright © 2008 Natonal Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.