My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to PSA – Re-Submittal of Permits, Utility Coordination, Appraisals, and Easement Acquisition Services for Prairie Ave. Water Main Loop - HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to PSA – Re-Submittal of Permits, Utility Coordination, Appraisals, and Easement Acquisition Services for Prairie Ave. Water Main Loop - HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:40:21 AM
Creation date
2/26/2020 11:08:12 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of pages, referred to in <br />and part of thekgreement between Owner and Engineer <br />for Professional Services dated June 27._2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. Two (2) <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: June 27, 2017 <br />b. Owner: Board of Public Works, Citv of South Bend Indiana <br />C. Engineer: HWC Engineering_- <br />d. Project: Ci of South Bend —Prairie Avenue Water Main Loop <br />2. Description ofModifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />This Amendment includes the engineering services to update the final design, <br />permitting, and additional services for the project due to delays in securing <br />funding and acquiring easements. The detailed scope of services is included <br />in Attachment 2. This work will be completed as a part of Exhibit A, Part 1— <br />Basic Services and Part 2 — Additional Services. <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br />The original agreement approved on June 27, 2017 included the study & <br />report phase which consisted of completion of a scoping report to identify the <br />recommended route for the water main extension to "loop" the Four Winds <br />Casino water main to the City's water system and serve as a "Basis of <br />Design" for the project. The scoping report was approved by the City on <br />September 15, 2017. <br />Amendment No.1 modified the scope of services to include the design, <br />bidding, and construction engineering services in accordance with Exhibit A, <br />Part 1— Basic Services for the recommended project in the scoping report. It <br />also included land acquisition services in accordance with Exhibit A, Part 2 — <br />Additional Services. The recommended project in the scoping report consists <br />of approximately 6,500 feet of 12-inch diameter water main and all <br />appurtenances including valves and hydrants. The project includes a jack <br />and bore installation of 12-inch carrier pipe with 24-inch steel casing for the <br />Paget <br />(Exhibit K — (Amendment No. Two to owner -Engineer Agreement) -Attachment 1) <br />EJCDC E500 Agreement Between Owner and Ergber for Professional Services. <br />Copyright © 2008 Natonal Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.