My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to Agreement for Engineering Services for US 20 Water Main Extension to South Bend Chocolate Company Site – A & Z Engineering, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to Agreement for Engineering Services for US 20 Water Main Extension to South Bend Chocolate Company Site – A & Z Engineering, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:39:21 AM
Creation date
2/12/2020 9:37:33 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. A Lump Sum amount of 127,600 based on the following <br />estimated distribution of compensation: <br />j. Potholing item was non -performed in Amendment no. 1 <br />and credited towards Amendment no. 2 <br />k. Watermain alignment cost study, layout and design plans <br />Break-up of item k as under, <br />i. Alterrnate cost study of two alignments $2,250 <br />ii. Preliminary Design Phase and City review $10,500 <br />iii.Final Design Phase including Rule5 & <br />Indot Permits and City review $13,900 <br />iv Bidding and Negotiating Phase $3,350 <br />9 800 <br />$30,000 <br />B. Period of Service: The compensation amount stipulated in Compensation Packet <br />BC-1 is conditioned on a period of service not exceeding 6 months. If such period <br />of service is extended, the compensation amount for Engineer's services shall be <br />appropriately adjusted. <br />Agreement Summary <br />a. Original Agreement amount: <br />$53,850 <br />b. Net change for prior amendments: <br />$53,550 <br />c. This amendment amount: <br />$20,200 <br />d. Adjusted Agreement amount: <br />$127,600 <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br />Owner and Engineer hereby agree to modify the above -referenced Agreement as set forth in this <br />Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in <br />effect. The Effective Date of this Amendment is <br />C611d/01ia.�i <br />City of South Bend, IN <br />Board of Public Works <br />ENGINEER: <br />A&Z Engineering, LLC <br />By:�r+ �.n .. <br />rage c <br />(Exhibit K— (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.